SA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler Tube

China SA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler Tube, Find details about China A106b Gr. B Steel Pipe, A333gr. B Steel Tube from SA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler Tube

Thickness
1-30 mm
Length
5.8-12m
Od
10 - 1020 mm
Standard
GB ASTM DIN JIS
Transport Package
Standard Shipping
Specification
1-12m
Origin
China
HS Code
7304319000
Thickness
1-30 mm
Length
5.8-12m
Od
10 - 1020 mm
Standard
GB ASTM DIN JIS
Transport Package
Standard Shipping
Specification
1-12m
Origin
China
HS Code
7304319000

Sa106 Sa-179m Sa106 Sa192 Sa209 Sa210 Gr A B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler Tube Steel Pipe

Product Description
1. Grade: 10#, 20#, 45#, 12Cr1MoV, 30CrMo, 12Cr1MoVG, 16Mn, St37, St52, St42.
2. Size:  Ф219~Ф3048mm, 10-120inch
3. Standard: API5L,ASTM A252, EN10219,GB/T9711
4. End Design: Beveled ends or plain ends with protection cap
5. Certification: ISO9001, SGS, API, GOST, BV

Product NameASTM LSAW steel pipe GRB carbon steel pipe diameter 2000mm
MaterialCarbon Steel Pipe/ Steel Billet
ColorBlack Painting or bare pipe
StandardAPI Spec 5L, GB9711, ASTM A53, ASTM A252 ASTM A500
GradeAPI5LGRB,A53B,S235JR,S275JR,S355JR,16Mn,Q195,Q215,Q235,Q345
DimensionФ219~Ф3048mm, 10-120inch
ThreadBeveled ends or plain ends with protection cap
Usedwater, gas, and oil; construction and piling...
SA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler TubeSA106steel Pipe SA-179m SA192 Steel Pipe SA209 SA210 Gr a B A1 T1 C Heat Exchanger Carbon Alloy Seamless Boiler Tube

Specification of Steel Pipe

Scaffolding Steel Pipe

Out diameter 

(mm)

Wall thickness

(mm)

Length 

(m)

48.3 (1.5 inch)

2.5

6/9/12

48.3 (1.5 inch)

2.75

6/9/12

48.3 (1.5 inch)

3.0

6/9/12

 


Trade Information
1.Trade Terms: EXW, FOB, CFR, CIF

2.MOQ: 25MT

3.Payment Terms: 30% deposit by T/T and 70% balance against the copy of B/L by T/T, or irrevocable L/C at sight.

4.Delivery Time: within 15-40 days after receiving your 30% deposit by T/T or your irrevocable L/C at sight.


Packing & Delivery
Packing Details  : Standard export package or as your requirement
Delivery Details : within 20 days after receipt payment
 

If you have another question, pls feel free to contact us as below:

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and wooden boxes,or as customers' requirements.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 5 to 7 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. 
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
   2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.