China Sy-V017 Ophthalmology Instrument Refractometer Optometry Machines, Find details about China Optometry Machines, Ophthalmic Auto Refractometer from Sy-V017 Ophthalmology Instrument Refractometer Optometry Machines
1,Adopt ARM process and latest image proc-ess technique,which makes the measurement be more quickly. | ||
2,Proven optical system and auto fog chart,which makes the measurement be more accuracy. | ||
3,As small as 2.0mm pupil diameter can be measured. | ||
4,5.7"LCD color display. | ||
5,Pupil distance auto measured available. | ||
6,New compact design enchances patient interaction. | ||
7.Support Date connection with external machines,such as computerized vision tester and auto projector. |
Measurement Range | Sphere -20D~+20D (VD=12mm) 0.125D/0.25D steps | ||||
Cylinder -8D~+8D 0.125D/0.25D steps | |||||
Axis angle 1°~180° 1°steps | |||||
Pupillary Distance | 45~85mm 1mm steps | ||||
Vertex Distance | 0/12/13.75/15mm | ||||
Minimum Pupil Diameter | 2.0mm | ||||
Chart | Auto Fog Chart | ||||
Date Saving | 10 Measuredvalues for both eyes | ||||
Specification | Display: 5.7" LCD(color) | ||||
Print: Built-in Thermal Printer | |||||
Power Suppiy: AC 220V ,50Hz or 110V, 60Hz | |||||
Dimensions/Weight: 690(W)*430(D)*720(H) 18kg | |||||
Output:RS-232 | |||||
Power Save:5/10 min(Selectable) |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.