GD200F-LS drilling machinery drilling equipment

China GD200F-LS drilling machinery drilling equipment, Find details about China HDD machine, drilling rig from GD200F-LS drilling machinery drilling equipment

Model NO.
GD200F-LS
Type
Track
Engine Power
113 kw
Max Torque
6500 N·m
Max Mud Pump Flow
250 L/Min
Trademark
Goodeng
Transport Package
Nude Packing
Specification
6750*2050*2400 mm
Origin
China
HS Code
843041
Model NO.
GD200F-LS
Type
Track
Engine Power
113 kw
Max Torque
6500 N·m
Max Mud Pump Flow
250 L/Min
Trademark
Goodeng
Transport Package
Nude Packing
Specification
6750*2050*2400 mm
Origin
China
HS Code
843041
Horizontal Directional Drilling Machine
  
[Main Performance Characteristics]

  

1.The machine is equipped with Cummins engine, with high efficiency, large power, low fuel consumption, low noise, strong ability in construction.
2.Rotation adopts American Eaton large torque motor driving directly, with large torque, stable performance, and two gears speed regulation. Push & pull adopts American Eaton motor and three gears speed regulation. The Construction speed is far ahead of other manufactures in the same industry. Driving head reserves reinforced power -push & pull force, which expands the scope of drilling construction.
3.It is equipped with hydraulic gear pump with military technology. Steel track walks by wire-control, which is convenient for load & unload and transfer.
4.Operation table adopts man-machine construction manner with comfortable operation, which greatly reduce workers fatigue level, broad vision, and comfortable seat.
5.Equipped with φ60×3000mm drill rod, the machine uses less field area, meeting the requirement for high efficiency construction in small place.
6. Electric design is reasonable with low failure rate, which is easy to maintain.
7.The rig shape is beautiful, easy to repair, which fully shows "people-oriented" design vision.

  
[Main Technical Parameters]

   
Engine Power113 kwMax Torque6500 N·m
Rig Weight9500 kgDimension(L*W*H)6750*2050*2400 mm
Max. Push & Pull Force225/300 knMax Rotation Speed230 r/min
Max.. Push & Pull Speed60 m/minMax. Mud Pump Flow250 L/min
Caterpillar Walking Speed2.5-4.0 km/hMax. Mud Pump Pressure8 Mpa
Enter Drill Angle12-22°Max. Climbing Gradient17°
Max. Aperture DiameterΦ900 mm(Soil Depended)Max. Crossing Length300 m(Soil Depended)

[Product Photos ]
    
GD200F-LS drilling machinery drilling equipment
GD200F-LS drilling machinery drilling equipment

GD200F-LS drilling machinery drilling equipment
GD200F-LS drilling machinery drilling equipment


[Company Information]

GD200F-LS drilling machinery drilling equipment
GD200F-LS drilling machinery drilling equipment

[Company Profile]


"Goodeng Machine", founded in May 2002, is a national high-tech enterprise, which is specialized in research & development, manufacturing, sales and service for trenchless equipment. Our main products are GD/GS series of horizontal directional drilling machine and accessories. As Mechanization Research Branch industrialization base of China Academy of Building Research, Goodeng Machine has independently developed almost 30 models of horizontal directional drilling machine from 5T to 1200T with strong and professional R & D team's support, which has filled in multiple domestic and foreign technical blanks. Many kinds of products have obtained national and provincial progress prize in science and technology of machinery industry. In 2018, "Goodeng Machine" had honor to get the Chinese Well-Known Trademark, which is the only enterprise to acquire in China's trenchless industry.
   
[Competitive Advantage]

  
1. Competitive Price: We work as the leading dealers of various leading China construction machinery factories, and are treated with best dealership prices every year. From numerous comparisons and feedbacks from clients, our price is more competitive than other factories.
2. Quick Response: Our team is consisted of a group of deligent and enterprising people, working 24hrs/day to respond clients'  inquiries and questions all the time. Most problems can be solved within 12 hours.

  
[FAQ]
  
1. What about the warranty time?
    A:12 months after shipment or 2000 working hours,whichever occuts first.
2. What about the delivery time?
    A:20 days after receiving the deposit.
3.What kind terms of payment can be accepted?
    A:On T/T term, 30% down payment is required in advnce, and 70% balance shall be before shipment, or
        against the copy of original BL for old client.
        On L/C term, 100% irrevocable L/C without"soft clause" can be accepted. 

4.What logistics ways we can work for shipment?
    A: We can ship machine by sea and road.