Power Press 300t Stamping Line with Progressive Die and Transfer System

China Power Press 300t Stamping Line with Progressive Die and Transfer System, Find details about China Power Press 300t, Transfer System from Power Press 300t Stamping Line with Progressive Die and Transfer System

Power Source
Pneumatic
Precision
High Precision
Certification
CE, ISO 9001
Condition
New
Trademark
KINGLAN
Origin
China
HS Code
84624119
Power Source
Pneumatic
Precision
High Precision
Certification
CE, ISO 9001
Condition
New
Trademark
KINGLAN
Origin
China
HS Code
84624119
Machine Image
ALE 200T, 250T, 300T, 400T, 500T, 600T, 700T, 800T, 100T, 1200T, 1500T, 1800T, 2000T, 2400T pneumatic punching machine stamping turkey project solution whole line solution with stage mold and transfer system

Professional Manufacture Automatic pneumatic power Press Machine 

This machine is applicate to all drawing, blanking, forming process, especially in the following areas: all kinds of containers, all kinds of automobile covering parts, electric parts, kitchen utensils, tractor, motorcycle, aerospace,aviation, electronics, instrumentation, plastic,rubber,chemical and other industrial departments.

Main Features

1) High accuracy, reach JIS-Grade1
2) High rigidity, steel-welded frame
3) High precision, 6-side long guide rail
4) Dry type pneumatic clutch-brake unit
5) Imported safety dual-solenoid valve for clutch
6) Automatic grease lubrication system
7) Frequency drive inverter
8) PLC system

 
ItemALE-200ALE-250ALE-300ALE-400ALE-500
Model SHSHSHSmall TableLarge TableH
CapacityTon200250300400500
Rated Tonnage Pointmm6373737773
Speed Per Minutes.p.m20-5035-7020-4030-6020-4030-5020-4020-3020-4020-50
Stroke lengthmm250150280170300170300300300170
Die Heightmm500450550450550450550550600500
Slide Adjustmentmm120120120120150
Slide Areamm2090×750×952500×900×952500×90952700×1000×953100×1000×953100X1000X952700X1000X95
Bolster Areamm2200×940×1702500×1000×1702500×1000×1902700×1000×1903100×1000×1903100X1000X1902700X1300X190
Main Motorkw.p15×418.5×430×430×445X4
Slide Adjust Device Electric driving
Air Pressurekg/cm²5~65~65~65~65~6
Presses Precision CNS(Jls)1classCNS(Jls)1classCNS(Jls)1classCNS(Jls)1classCNS(Jls)1class
 
ALE   
Accessories Standard Accessories Optional 
Hydraulic Over-load Protector   Electrical Automatic Lubrication System°
InverterPneumatic Die Cusion Device°
Electrical Slide Adjust Device Foot Switch°
Die HEIGHT Indicator Quick Die Change Device °
(Die Lifter,Clamp And Die Arm shift mode)
Balance DeviceSlide Knock-out Device°
Rotary Cam SwitchMisfeed Detection Consent°
Crank Angle IndicatorAnti Vibration Press Mount°
Electric Stroke CounterPhoto-electronic Safety Device°
Air source RecepatacleFeeder°
Preset CounterUncoiler°
Preset CounterLeveler°
Against Over-run Safety DeviceMachanism Hand°
Maintenance Tool BoxDie Room Light°
Operation Manual  
Centralized Lubrication System  
 
 

Stamping Lines
Power Press 300t Stamping Line with Progressive Die and Transfer System
Power Press 300t Stamping Line with Progressive Die and Transfer System

Power Press 300t Stamping Line with Progressive Die and Transfer System
Power Press 300t Stamping Line with Progressive Die and Transfer System
Power Press 300t Stamping Line with Progressive Die and Transfer System

Certificates
Power Press 300t Stamping Line with Progressive Die and Transfer System

Our customers
Power Press 300t Stamping Line with Progressive Die and Transfer System

Package & Delivery

Power Press 300t Stamping Line with Progressive Die and Transfer System
Contact US

FAQ
Q: Are you a factory or trading company?
A: We are a factory which has been producing stamping machines for more than 35 years.

Q: What are your main products?
A: We specialize in manufacturing press machine, decoiler straightener and feeder, metal stamping die, transfer arms etc. ie, we mainly help customers contract to build the whole stamping line projects.

Q: What's the delivery time? 
A: The standard machine is 25 to 30 days after payment. If asked to supply whole production line by our customer, we will confirm the delivery time based on the specific project itself. 

Q: What's your payment term?
A: we advise 30% T/T deposit, balance paid before shipment.

Q: Do you receive OEM?
A: Yes, we warmly welcome customers to do OEM in our factory.