China 5kVA/50kv Partial Discharge Measurement System, Find details about China Lab Equipment, Hipot Tester from 5kVA/50kv Partial Discharge Measurement System
Partial discharge test system is mainly used for testing frequency voltage insulation level of various insulation materials, insulation structure and electrical products, also as partial discharge frequency testing power supply for testing object such as transformer, mutual inductor and lightning arresters. It widely used in electrical manufacturing, power operation departments, research institutes and universities.
It is consists of a PD free tested transformer (Oil immersed type or SF6 gas inflatable type), test console, digital PD detector, PD free isolation filter, PD free protection resistor, PD free coupling capacitor.
1.A variety of control methods and insulation methods can be used to configure freely according to user demand.
2.Build-in multiple frequency power generator is used for testing partial discharge value of high voltage transformer.The system has a built-in multi-frequency power generator which can be used to measure the discharge of high voltage transformer.
3.Manual control operation is intuitive, easy to use maintenance, low price.
4.It has gas insulation, transformer oil insulation, dry epoxy resin insulation and other forms test transformer, can choose and match according to user's demand.
5.According to the user's requirements, different sets of measuring instruments can be configured to meet the requirements of different precision and analysis faults.
6.Automatic control system can be used in different configurations of the bureau, and the results can be automatically detected and analyzed.
Rated Capacity | 5-1000kVA | Impedance Voltage | 10% |
Input Voltage | AC 220V/AC 380V | Output Voltage Waveform | Power frequency, sine wave |
Output Voltage | AC 0-1000kV | Surface Temperature | Oil immersed:<55ºC Gas: <50ºC |
Partial Discharge | Under rated voltage≤5PC | No-load Loss | 0.2%-0.35% |
Insulation Method | Oil, Gas | Allowed Continuous Operation Time | Once an hour |