China Earth-Moving Heavy Duty Everun Er50 4WD Diesel Engine 5.0ton Wheel Loader, Find details about China Wheel Loader, Mini Loader from Earth-Moving Heavy Duty Everun Er50 4WD Diesel Engine 5.0ton Wheel Loader
Standard bucket, , Weichai Steyer Engine, Joystick, 130W Heater, 220V Engine Heater, Luxury Cabin Inside, Backward Imagine, Comfortable Seat, Adjustable Steering Wheel, Lock for Lifting and Steering Cylinder, Hydraulic Pressure Check System, Parallel Linkage, 23.5-25tyre, Free Service Spare Parts etc.
Specification | |
Rated capacity | 3.0m3 |
Rated weight | 5000kg |
Operating weight | 16700kg |
Performance of bucket being set level | Yes |
Max. breakout force | Above 160KN |
Total of three time:lifting dumping lowering | 11.3s |
Max.dump height | 3200mm |
Max.dump reach | 1148mm |
Wheel base | 2920mm |
Tread | 2200mm |
Overall dimensions (length*width*height) | 7720*3030*3378mm |
Engine | WEICHAI |
Model | STEYR WD10G220E21 |
Pattern | Turbocharger, vertical, water-cooled, 4-stroke, direct injection |
Max.torque | 920N.m |
Rated power | 162KW |
Specified rotational speed | 2200r/min |
Transmission | ZL50 |
Model of torque device | Combined with the gearbox |
Pattern | single stage two phase four components |
Pattern of gearboxes | Planetary-structure |
Number of great shift | 2 forward,1 reverse |
Max.travel speed | 40km/h |
Main reducer type | Spiral bevel gear first reduction |
Pattern of wheelside moderation | Single stage planetary |
Type size | 23.5-25 |
Steering angle(each direction) | 35°±1 |
Brake system | Air assisted oil disc on four wheel |
Parking brake | Soft control , disc type |
Pressure of working hydraulic system | 18Mpa |
Q: What is your payment term?
A: L/C, or T/T 30% down payment, balance to be paid against BL copy and loading pictures.
Q: What is your delivery time?
A: Within 35-35days after receving the down payment (for standard configuration).
Q: What is your main market?
A: Europe, North America, South America, Oceania, Southeast Asia, Africa, Eastern Asia and so on, in more than 50 countries.
Q: If products have some quality problem, how would you deal with?
A: There is one year or 1200 working hour warranty, we will gurantee you can receive the light/ small spare parts within 5 working days. In order to make good service for our European and Oceanian customers, we have set up Europen company in Germany and Everun WA in Australia with our partner.