China Commercial Automatic Industrial Watermelon Pineapple Melon Coconut Fruit Skin Removing Peller Peeler Peeling Machine, Find details about China Fruit Peeling Machine, Peeling Machines for Fruit from Commercial Automatic Industrial Watermelon Pineapple Melon Coconut Fruit Skin Removing Peller Peeler Peeling Machine
Introduction:
This machine can peel the fruit with different height and diameter.
The peel thickness is adjustable for the machine has a computer control functions according to shapes of fruit.
This machine can peel total 28 kinds of fruit such as pineapple, pomelo, grapefruit, yam, pumpkin, watermelon, melon and so on.
1.The whole machine frame shell material quality stainless steel, computer control, PLC and
other electronic components using Japan Omron.
2.When working, click on the touch screen, set the parameters, put the color solution in the tank,and then put the fruit and vegetables into the fruit, the machine can automatically peel, cut,poke the nucleus, cut the valve, separation and color protection from three Mouth out of thepulp, peel, both ends of the skin and the nucleus.
Parameters:
Capacity | 500 pieces/h |
Material | 304SS |
Power | 0.8kw,380v/220v 50hz |
Peeling thickness | 1.5-10mm |
Diameter | 80-250mm |
Height range of fruit | 160-350mm |
Weight | 170kg |
Dimension | 1500*750*1900mm |
is engaged in the development, design, manufacture and sale of food processing machinery. over the years adopts many new ideas, absorbs a wide range of advanced technologies worldwide as well as excellent processing and testing equipment, and takes a reliable strict quality guarantee system and an important after-sales service system to win customer's trust in the industry.
1. Installation and Debugging: Within the time of warranties, the seller will send the engineer to guide to install the machine, the buyer should prepare the materials needed and should be responsible for the engineer's safety, travel expense, accommodation abroad. And shall pay the salary for the engineer,150 dollars per day, and if the installation would exceed one month, then the buyer shall pay the engineer 200 dollars per day for the exceeding time. And the seller will provide the Instruction Manual and the Foundation Drawings.
2. The quality assurance date is one year (exclude the quick wear parts) after commissioning, but not exceed 15 months from date on which machine leaves the factory.
3. If the equipment appear the equipment failure because of improper handling
of user, we are in charge of maintenance, and collect the appropriate cost.
4. We offer the components with favorable price, perdurable maintenance.
After quality assurance date, if the equipment needs to be repaired, we only collect the cost price