Splash Cooling Tower Fills for Sewage Water Towers

China Splash Cooling Tower Fills for Sewage Water Towers, Find details about China Cooling Tower Fill, PP Splash Grid Fill from Splash Cooling Tower Fills for Sewage Water Towers

Noise Level
Ordinary
Application Fields
Industrial
Certification
ISO
Condition
New
Size
955*705/ 705*705/ 705*255
Color
Black
Weight
1kg
Trademark
LATINO
Transport Package
Wooden Box
Specification
Width750mm Length customized
Origin
China
HS Code
3926901000
Noise Level
Ordinary
Application Fields
Industrial
Certification
ISO
Condition
New
Size
955*705/ 705*705/ 705*255
Color
Black
Weight
1kg
Trademark
LATINO
Transport Package
Wooden Box
Specification
Width750mm Length customized
Origin
China
HS Code
3926901000
Splash Cooling Tower Fills for Sewage Water Towers
955*705 splash grid for waste water application in cooling tower
  • Brand LATINO
  • Product origin China
  • Delivery time within 2 weeks
  • Supply capacity 200 m3/day
Size Installation Size WeightThickness  Color Packaging 
955*705 1000*750mm1KG25mmBlackWooden Box
705*705750*750mm0.8Kg25mmBlack Wooden Box 

Splash Cooling Tower Fills for Sewage Water Towers
Splash Cooling Tower Fills for Sewage Water Towers
Splash Cooling Tower Fills for Sewage Water Towers

Cooling Tower Film types fills have been popular with the Cooling Tower Industry as a result of their efficiency of not only handling large quantities of water but also the overall tower efficiency. However in the case of heavily contaminated water, film type fills are susceptible to accumulating deposits and often make way for the use of splash type fills for effective water cooling. The forgiving nature of splash fills towards 'dirty' water and imperfect water distribution is offset by the need to have larger towers and thus higher capital costs as well as pumping heads.

Cooling Tower Splash fills work on the principle of causing the flowing water to fall through a grid of 'splash bars/grids' causing the water droplets to break up and increasing the contact time between water and air. As the falling water encounters multiple layers of these splash fills, the droplets keep dividing into smaller sizes thereby increasing the heat transfer and thus cool the water.


Splash Cooling Tower Fills for Sewage Water Towers


Splash Cooling Tower Fills for Sewage Water Towers

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .

Splash Cooling Tower Fills for Sewage Water Towers

Our Company 

Tianjin LATINO Environmental Technology Co., Ltd. are on the base of high quality, good service, we win good reputation in the industry. We help our customers better to get cooling tower products from China.We specializes in manufacturing various cooling tower and parts. Our company's cooling tower products is being used widely around the world. Our business involve in Italy, Germany, Australia, UK, Indonesia, Thailand, Belgium, France, Poland, India, Malaysia, Singapore and New Zealand, etc..

Latino has a high quality team of talents. Team members are young and energetic, with a sense of innovation and the courage to meet the challenge.Team members develop and practice new e-marketing mode, follow consumer demand, provide customers with high quality products and services.

LATINO has an experienced team in quality and project implement to support the purchasing activities of overseas customers;The company's main products are cooling tower parts, such as Film Fill, drift eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,FRP gratings, Fan stack, band & clamp, etc.; Our product are approved by CTI and we have our own patent .
 
Our factory has the largest capacity and have been working with the recognized brands of cooling tower in around the world, our team have rich experience in oversea projects.we were your colleague, knowing your care, your culture and your requirements.So we make it easy for you to purchase high quality and good value internal plastic parts of cooling tower in China.

Our fill has been verified by actual operation for more than ten years. It is very reliable and efficient. You can rely on us to deliver a successful project while reducing your total project costs!
Splash Cooling Tower Fills for Sewage Water Towers



Splash Cooling Tower Fills for Sewage Water Towers
Splash Cooling Tower Fills for Sewage Water TowersSplash Cooling Tower Fills for Sewage Water Towers
FAQ
 
Q1. What's your Main Product ?
The company's main products are cooling tower and Cooling tower parts such as Film Fill, drift
 eliminator and spray system, UPVC distribution pipes, FPR winding splash pipe, FRP profile parts,
FRP gratings, Fan stack, band & clamp, etc


Q2:How to define the product price?
A: PVC cooling Tower  material is based on the thickness,vicat point, color, density,fire classification, packing and quantity.

Q3. Do you keep the stock of your products?
A: Yes, we maintain a certain amount of standard products inventory, in time to meet your needs.

Q4. Whether you have the ability to accept the product customization?
A: Products can be customized, we can make the new thermoforming or extruding mode based on your drawings and we can sign a confidentiality agreement about your patented product, pls contact us for any further information.

Q5: What's your delivery time ?
The delivery time normally will be 10 -30days , the specified delivery date will be according to customer request and order quantity .

Q6. How to reassure those who doubt the product quality and actual situations?
A professional system can ensure the whole latest development which will be monitored by you through the reports in the diffferent stages.

Q7.How about your after sale service?  
1. Warranty service
a).Warranty: 1 year.
b) .Warranty starting: acceptance date.  
2. Service commitment
Warranty period:
a). Our company will be responsible for the quality problems arising from the maintenance, replacement of parts and related materials.
b). Artificial damage will be repaired by our company, but the damaged devices shall be paid.
3. Expiration of the warranty period:
a). Our company provides lifelong maintenance, but the user is responsible for the cost of labor and material.
b). Our company also provides charging upgrades and improvements following to the customer's requirements.