Air Flow Spray Drying Machine
Spray Dryer Principle:
The clean air is heated and entered into drying tower, the raw material inside the tower is atomized into fine mist through muzzles of two or three flows. The raw materials carry out heat exchange with the hot air rapidly to evaporate the moisture (solvent) in the raw materials. The moisture or solvent is discharged accompany with hot air, and then the power product is produced.
Spray Dryer Features:
It is idea for raw materials that are heavy in viscosity, paste material, which the other equipment can not replace it.
More varieties and wide application in drying with lower temperature.
The nozzle is simple in structure, convenient in maintenance and low cost in operation.
Technical parameters:
parameters \ type | 5 | 25 | 50 | 100 | 150 | 200 |
amount of evaporation Kg/h | variable=150°C-90°C | 1.5 | 7.5 | 15 | 30 | 45 | 60 |
variable=200°C-100°C | 2.5 | 12.5 | 25 | 50 | 75 | 100 |
variable=250°C-100°C | 3.75 | 18.75 | 37.5 | 75 | 112.5 | 150 |
variable=300°C-100°C | 5 | 25 | 50 | 100 | 150 | 200 |
variable=350°C-110°C | 6 | 30 | 60 | 120 | 200 | 240 |
pressure of air M3/min | 0.3 | 0.4 | 0.6 | 1.5 | 2.7 | 3.4 |
pressure of air Mpa | 0.4 | 0.6 | 0.7 |
Heat resource | electricity,electricity+steam,coal(oil)combustion furnace |
consumption of heating 104Kcal/h | 1 | 5 | 10 | 20 | 30 | 40 |
power KW | 0.75 | 2.2 | 4 | 7.5 | 11 | 15 |
FAQ:
1. Before you inquiry, you should let us know the following information:
a.>Name of the material to be dried?
b.> Shape of the material to be dried?
c.> Initial moister of material?
d.> Final moister of material?
e.> Drying materials can withstand the maximum temperature?
f.> Capacity of dried material? kg/h (or capacity of inlet wet material? kg/h)
g.> Equipment material, stainless steel or carbon steel?
h.> Using heating source, steam / electricity / coal / heat conduction oil or other?
2. Our usual price is based on FOB Shanghai, if you request CIF, please give us the delivery port, then we will give you CIF price.
3. Our usual payment term is: 30% TT in advance, 70%TT before shipment.