China Power Transformer 230/345kv Transformer High Voltage, Find details about China Power Transformer, Power Transformers from Power Transformer 230/345kv Transformer High Voltage
Rated power (kVA) | Valtage | Connction | 9 loss (kW) | 10 loss (kW) | 11 loss (kW) | No-load Loss(%) | Impedence Voltage (%) | ||||
H.V(kV) | L.V(kV) | No-Load Loss | Load oss | No-Load Loss | Load Loss | No-Load Loss | Load Loss | ||||
31500 | 230-242 ±8×1.25% | 6.3 | YNd11 | 38 | 135 | 34.2 | 128.3 | 30.4 | 128.3 | 0.7 | 12-14 |
40000 | 10.5 | 45 | 157 | 40.5 | 149.2 | 36 | 149.2 | 0.63 | |||
50000 | 35 | 54 | 189 | 48.6 | 179.6 | 43.2 | 179.6 | 0.56 | |||
63000 | 38.5 | 63 | 220 | 56.7 | 209 | 50.4 | 209 | 0.56 | |||
90000 | 10.5 | 80 | 288 | 72 | 273.6 | 64 | 273.6 | 0.49 | |||
120000 | 11 | 99 | 346 | 89.1 | 328.7 | 79.2 | 328.7 | 0.49 | |||
150000 | 35 | 116 | 405 | 104.4 | 384.8 | 92.8 | 384.8 | 0.42 | |||
180000 | 38.5 | 135 | 468 | 121.5 | 444.6 | 108 | 444.6 | 0.42 |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer with own import & export company. |