Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete

China Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete, Find details about China Building Material, Formwork from Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete

Model NO.
Trench Box
Project Solution Capacity
Graphic Design, 3D Model Design, Total Solution Fo
After Sale Service
Online Technical Support, Onsite Installation
Usage
Concrete Pouring
Product Capacity
67kn/Sqm
Design Style
Modern
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China
Model NO.
Trench Box
Project Solution Capacity
Graphic Design, 3D Model Design, Total Solution Fo
After Sale Service
Online Technical Support, Onsite Installation
Usage
Concrete Pouring
Product Capacity
67kn/Sqm
Design Style
Modern
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Trademark
LIANGGONG
Transport Package
Standard Package
Specification
Customized
Origin
China

Product Description

Trench Shoring Box
Trench boxes are used in trench shoring as a form of trench ground support. They offer an affordable lightweight trench lining system. They are most commonly used for ground works operations such as installing utility pipes where ground movement is not critical.
The size of the system required to use for your trench ground support depends on the your maximum trench depth requirements & the size of the pipe sections that you are installing in the ground.

Products Show

Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for ConcreteLianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for ConcreteLianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for ConcreteLianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for ConcreteLianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete




 

Characteristics

1.The length of shaft beam is adjutable.

2.Stable in structure and convenient in operation.Connecting parts are standard and universal.

3.Supports,formwork and construction load are all born by anchors.No scaffold is needed.It is suitable for casting high-rise cores.

4.Variety in specification and adjustability of length of the platform beam are adapted to structural dimensions of the shaft.
 
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our Company
Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete
Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete
Customer Photos
 
Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete
Lianggong Shield Trench Shoring Supporting System Ditch Formwork Trench Box for Concrete

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !