A11vlo190lrdu2/ 11r -NZD12K02 Hydraulic Piston Pump for Truck Paver

China A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver, Find details about China Hydraulic Pump, Pump from A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

Model NO.
A11VLO190LRDU2/11R-NZD12K02
Power
Hydraulic
Straight Shaft Swashplate Piston Type
Pressureoil
Radial Plunger Pump Type
Valve with Flow
Apply for
Pump Truck
Apply to
Paver
Material
Cast Iron
Weight
85kg
Usage
Oil
Trademark
Pinxin
Transport Package
Standard Export Package
Specification
A11vlo190
Origin
China
HS Code
8413503190
Model NO.
A11VLO190LRDU2/11R-NZD12K02
Power
Hydraulic
Straight Shaft Swashplate Piston Type
Pressureoil
Radial Plunger Pump Type
Valve with Flow
Apply for
Pump Truck
Apply to
Paver
Material
Cast Iron
Weight
85kg
Usage
Oil
Trademark
Pinxin
Transport Package
Standard Export Package
Specification
A11vlo190
Origin
China
HS Code
8413503190
Our advantages:
1. There are lots of available A11VO series hydraulic piston pump in stock.
2. We are professional supplier of hydraulics.
3. Our factory has more than 10 years exprience in hydraulic industry.
4. Our factory is closed to Shanghai port & Ningbo port.


Product show:
A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

Field application:
A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

Package:
A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

Delivery:
A11vlo190lrdu2/11r-NZD12K02 Hydraulic Piston Pump for Truck Paver

Payment term:

1. T/T: 30% deposit by T/T, 70% balance by T/T before shipment

2. L/C at sight

Trade term: EXW or FOB Ningbo/Shanghai

 

Delivery time:

We have huge quantity of inventory for complete pumps, motor and some spare parts, 
so the leading time is within 3days if have in stock. 
If haven't, within 5days if the quantity is less than 50pcs. 
It depends on the quantity ordered.

Min. Order:
If the model is in common or the production are in our warehouse.
No MOQ for stocking production.Larger quantity, price will be more favorable.

Deliever Way:

By courier, like the DHL, UPS, Fedex,etc. It's door to door or barn to the door,
usually 5-7 days to arrive.

By air to air port, usually 3-5 days arrive.

By sea to sea port, usually 20-30 days arrive.

If your deliever time is very urgent, the best way is by courier or air.

If not, it's beat by sea.