400mm PVC Pn10 Tee

China 400mm PVC Pn10 Tee, Find details about China PVC Tee, Ball Valve from 400mm PVC Pn10 Tee

Model NO.
800030100
Wall Thickness
SCH40
Finish
Smooth
Technics
Injected
Pressure Rating
Pn10
Standard
GB
Certification
ISO
Color
Black,Grey,Blue
Pressure
Pn10
Standardfor
BS En ISO 1452, DIN8063, ISO4422, Gbt10002
Trademark
xita
Transport Package
Cartons
Specification
20-400mm
Origin
Changzhou
HS Code
3917400000
Model NO.
800030100
Wall Thickness
SCH40
Finish
Smooth
Technics
Injected
Pressure Rating
Pn10
Standard
GB
Certification
ISO
Color
Black,Grey,Blue
Pressure
Pn10
Standardfor
BS En ISO 1452, DIN8063, ISO4422, Gbt10002
Trademark
xita
Transport Package
Cartons
Specification
20-400mm
Origin
Changzhou
HS Code
3917400000
Descripition
Tee/Tee reducer/ Rubber Ring Tee
Standard:      ISO4422, ISO1452, GBT10002
Size:              20mm~400mm
Material:       100% Virgin PVC
Key Word         PVC Pipe,PVC Pipe Fittings, Regular Tee,
Color                 Grey or Black or Blue
Connection       Cement Type,  Glue Type
Pressure            PN10
Standard           BS EN ISO1452,ISO4422,DIN8063,GB/T1002.2
Certification     SGS,CE
Brand                XITA/OEM
Fittings are 100% inspected before delivery to customers with100% virgin material.
400mm PVC Pn10 Tee
CodeDescriptionSizePCS/CTN
800030100PVC Equal Tee20960
80003020025600
80003030032400
80003040040270
80003050050150
8000306006378
8000307007560
8000308009036
80003090011016
80003100012514
8000311001408
8000312001606
8000313001804
8000314002004
8000315002252
8000316002502
8000317002801
8000318003151
8000319003551
8000320004001

Factory&Company
400mm PVC Pn10 Tee
400mm PVC Pn10 Tee
400mm PVC Pn10 Tee

Our Business Steps:                                    
1)Communication: customers interest in our products , discuss price , check sample quality
2)Negotiation : talking about the sizes, quantity , and other details                                 
3)Ordering: settle down and place order to us                                   
4)Producing: after orders , we start productions at once                                  
5)Packing: while products come out of machines then packed                                  

6)Delivery : everything gets ready ,place the ship, send to dock , to be shipped