500 ton HDD Machine for gas/oil pipe laying

China 500 ton HDD Machine  for gas/oil  pipe laying, Find details about China HDD Machine, Drilling Rig from 500 ton HDD Machine  for gas/oil  pipe laying

Model NO.
GS5000-LS
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Track
Engine Power
2*294 kW
Max Torque
140000 N·m
Max Mud Pump Flow
Extra Mud Pump
Trademark
Goodeng
Transport Package
Nude Packing
Specification
17700*2500*3460 mm
Origin
China
HS Code
843041
Model NO.
GS5000-LS
Bit Type
Drag Bit
Drilling Way
Rotary
Type
Track
Engine Power
2*294 kW
Max Torque
140000 N·m
Max Mud Pump Flow
Extra Mud Pump
Trademark
Goodeng
Transport Package
Nude Packing
Specification
17700*2500*3460 mm
Origin
China
HS Code
843041
500 ton HDD Machine  for gas/oil  pipe laying
Rig Weight57500kgDimension (L*W*H)17700*2500*3460mm
Max Torque140000N·mMax Push & Pull Force6000kN
Max Rotation Speed92rpmMax Push & Pull Speed45m/min
Max Clamp Force2550kNMax Unscrewing Force of Pipe Jaw370000N·m
Engine Power2*294kWMax Working Pressure35MPa
Drill Pipe DiameterΦ127mm-Φ168mmMax Length of Drill Pipe9.6m
Entry Angle9°-16°Max Caterpillar Walking Speed4.5km/h
Main Spidle Floating Distance100 mmMud Pipe Channel Diameter76.2/101.6mm
Max Mud Floating Volume2000L/minMax Mud Pressure12MPa
Permitted Environment Temperature-30°C-50°CPermitted Environment Humidity>90%
Max Aperture Diameter ø2000mm
(Soil Depended)
Max Crossing Length 2500m
(Soil Depended)
500 ton HDD Machine  for gas/oil  pipe laying

1.Two sets Weichai engine can meet different working conditions and save energy.

2. High-performance proportional electrical control open circuit system.

3. Driving head rotation and push & pull are performed in full-scale stepless speed regulation.

4. Front and back clamping can be separated, and the clamping can float in the whole process.

5. Equipped with φ140×9600mm or φ168×9600mm drill pipe.

6. Drill pipe bracket increases the accuracy of drill pipe loading and unloading.

7. 5ton crane.

8. Automatic rod loading/unloading equipment.

9. Steal track walking system is convenient for transferring at site.

10.Equipped with independent operation cabin with necessary and comfortable decoration.

11.Hydraulic system is designed in conformity to large flow and high pressure.

12.Self-designed and developed, combined electronic controlling system realizes its adaptive control to different working conditions and different geologic strata.

13.Liquid crystal man and rig exchange system can monitor rig condition at any time.

14.Rational and effective cooling system ensures safety, reliability and efficiency of system, extends motor using lifespan, and avoids motor damage.

500 ton HDD Machine  for gas/oil  pipe laying
500 ton HDD Machine  for gas/oil  pipe laying500 ton HDD Machine  for gas/oil  pipe laying500 ton HDD Machine  for gas/oil  pipe laying

1. What about the warranty time?

    A:12 months after shipment or 2000 working hours, whichever occurs first.

2. What about the delivery time?

    A:20 days after receiving the deposit.

3.What kind terms of payment can be accepted?

    A: On T/T term, 30% down payment is required in advance, and 70% balance shall be before shipment, or against the copy of original BL for old client.

       On L/C term, 100% irrevocable L/C without "soft clause" can be accepted. 

4.What logistics ways we can work for shipment?

    A: We can ship machine by sea and road. 

 5. What about the after-sales service?

   A: We have office and professional after-sales service team in many countries. After you receiving the new machine, we will provide you one engineering training installation and debugging service for 3-5days. If there are some problems, our after-sales service team will arrive the project site in shortest time.