China Machine Copper for Mill Stone Ore Corn in Pakistan Crasher Line Crushed Turquoise Bx328 Cement Head Heads Ice Hammer Crusher, Find details about China Copper Hammer Crusher, Copper Hammer for Crusher from Machine Copper for Mill Stone Ore Corn in Pakistan Crasher Line Crushed Turquoise Bx328 Cement Head Heads Ice Hammer Crusher
Wear-resistant, durable and stable operation
The impact lining plate uses high-quality anti-wear materials, and the wearability increases twofold. The service life is long, and the operation is more safe and stable.Low failure rate and low power consumption
The failure rate is low, and the operation process hardly appeared to fault as vibration, halt, etc. Electricity consumption is low so that all total costs can reduce about $20000
Large processing capacity and high efficiency
The material throughput is extensive, production and crushing efficiency is high, so our market machine is famous for balancing high efficiency and output.
high efficiency and large output of equipment.
Good environmental protection and less overflow dust
The sealing design is reasonable. Our machine allocates dust remover and silencer, has fewer dust levels, low noise, and better environmental protection. And can effectively improve the working environment.
Table of specifications and performance parameters | ||||||
MODEL | Specification (mm) | Inlet size (mm) | Max Feed Size (mm) | Power (kw) | processing capacity (t/h) | Outer Size (LxWxH)(mm) |
1615 | 1600x1500 | 1400x1000 | 550 | 200x2 | 280-550 | 3370x2925x2750 |
1716 | 1700x1600 | 1640x1300 | 600 | 250x2 | 500-850 | 3520x3000x3210 |
1720 | 1700x2000 | 1980x1300 | 650 | 400x2 | 600-1000 | 3670x3390x3330 |
1920 | 1900x2000 | 1850x1600 | 750 | 500x2 | 800-1500 | 3729x3330x4450 |
1. Are you manufacture or trading company?
We are factory, established in 2005.
2. How long is your delivery time?
7-10 days for the stock, 15-30 days for the mass production.
3. What is your payment method?
30% deposit in T/T advance, 70% balance before shipment.
4. How long is the warranty? Does your company supply the spare parts?
One year. Spare parts for you at lowest cost.
5. If I need the complete crushing plant can you help us to build it?
Yes, we can help you set up a complete production line and give you related professional advice. We had already build many mining projects in China & Overseas.