Polypropylene Nonwoven Ss Fabric Production Line for Hygiene Products

China Polypropylene Nonwoven Ss Fabric Production Line for Hygiene Products, Find details about China Nonwoven Production Line, Nonwoven Fabric Machine from Polypropylene Nonwoven Ss Fabric Production Line for Hygiene Products

Trademark
Guanlong
Transport Package
Wood Box
Specification
1.6//2.4/3.2M
Origin
China
HS Code
8449009000
Trademark
Guanlong
Transport Package
Wood Box
Specification
1.6//2.4/3.2M
Origin
China
HS Code
8449009000
Polypropylene Nonwoven Ss Fabric Production Line for Hygiene Products
 
Product NameSpunbond non-woven production lineTechnologyRhine, Germany
TypeM,S,SS,SSS,SMS,SSMS,SMMS,SSMMSSpinneretsize:0.45mm,10500 holes
Lead Time90-180 daysTrade typeManufacturer
Payment Method15% deposit  80% before shipping   5% after line runningPerformance3-25 Tons/day
LocationQuanzhou city Fujian province, ChinaWarranty 1 year
Near sea portXiamen port ,ChinaSIZE1600-3200 MM

Polypropylene Nonwoven Ss Fabric Production Line for Hygiene ProductsPolypropylene Nonwoven Ss Fabric Production Line for Hygiene Products
                               Polypropylene Nonwoven Ss Fabric Production Line for Hygiene Products                           
                              Guanlong Machinery Service

         
          
1.Installation:
           
            The seller will send 4-7 engineers to install, test the production line and train customers'
            workers in buyers' factory. It will take more than 1 month for the whole installation and
            operational training.
            The seller should cover engineers' salary and visa cost. And the buyer should pay the bill of
            Round air tickets, accommodations and transportation in buyers' country as well as food,
            medical care, safety cost, and related cost happened in buyers' country. Also, the buyer
            should support enough labor, electric wire near the control panel and tools for installations.
             2.Guarantee:

           Guarantee period for the delivered equipment will be 12month after installation but not later
           than 18months after the date of shipment. In case that any item proved to be defective and
           the damage is confirmed by seller's technicians within guarantee period, the seller will
           either send engineers to repair or supply a new components for replacement free of charge
           on the basis of CNF delivery. Besides, Guanlong will offer technical support during guarantee
           period.
           The above item does not apply to the parts which have regular spares or get damaged from
           normal wear, abnormal operation, improper maintenance or inadequate manual works. The
           seller is not liable for any machinery production loss under any circumstances.

         3. Service procedure during guarantee period:
 
           Guanlong provides pre-sales, sales and after sales service, especially one year of free
           maintenance warranty.
           If there are problems with the machine parts, customer can take pictures and send to us by
           email to explain the situation, we will help to solve it on line or by email as soon as possible.
           During the guarantee period, any malfunction or difficulty which can not get well done after
           communication, the seller will send engineers to buyers' factory for problem solving. The
           charge burned by buyers include costs of engineers' transportation and accommodation in
           buyers' country and air ticket.

        4.Packing:
 
           The line or components will also be treated according to export standard against damage and
           rusting before delivery