China′s Best CNC Milling Machine, CNC Machining Center, Machining Center, Find details about China CNC Milling Machine, CNC Machine from China′s Best CNC Milling Machine, CNC Machining Center, Machining Center
Item | Unit | EV640L | EV850L/M | EV1060L/M | EV1165L | EV1270L/M | EV1370L | EV1580 | EV1890 |
X/Y/Z-axis travel | mm | 600/400/450 | 800/500/500 | 1000/600/600 | 1100/650/600 | 1200/700/700 | 1300/750/700 | 1500/800/700 | 1800/900/800 |
Table size | mm | 420*700 | 500*1050 | 600*1300 | 660*1200 | 700*1360 | 700*1400 | 800*1700 | 900*2000 |
Max. Table load | KG | 350 | 600 | 1000 | 1000 | 1400 | 1400 | 2000 | 2000 |
BT-Type | BT40 | BT40/50 | BT50(OPBT40) | ||||||
Spindle max. Speed | Rpm | 12000 | Belt type 10000 (op 12000/15000) | 6000 | |||||
Spindle power | KW | 5.5/7.5 | 7.5/11 | 7.5/11(op11/15) | 11/15(op15/18.5) | ||||
Cutting feed rate | mm/min | 0-20000 | 0-10000 | 0-8000 | |||||
Rapid feed rate | M/min | 48*48*36 | L: 48*48*36 M: 20*20*15 | L: 36*36*30 M: 20*20*15 | L: 36*36*30 | L: 30*30*24 M: 20*20*15 | 30*30*24 | X/Y: 16 Z: 14 | X/Y: 16 Z: 14 |
Net weight | KG | 4500 | 5800 | 6500 | 6800 | 7500 | 8000 | 12000 | 15500 |
NC System | MITSUBISHI M80B / Siemens 828D / FANUC OIMF Economical: EV640LE/850LE GSK25I) |
Serial No. | STANDARD CONFIGURATION | ORIGIN |
1 | Mitsubishi M80B Controller | Japan |
2 | Inseat Display Unit | Japan |
3 | Imported BT-40 12000 Rpm | Taiwan |
4 | Level C3 Ball Screw | Taiwan HIWIN/PMI |
5 | Three-Axis Flexible Linear rail cover | Taiwan |
6 | Spindle Blade Pneumatic Cylinder | Taiwan |
7 | Central Auto-Lubrication System | Taiwan |
8 | Angled imported ball bearing | Japan NSK |
9 | Axial Couplings | Japan |
10 | Operation Panel Unit | Taiwan |
11 | Imported MAG Handwheel | Japan |
12 | Working light | Taiwan |
13 | Relay Board | Japan |
14 | Control Panel Convective Heat Exchanger | Taiwan |
15 | Spindle Sided Blowing Devices | Taiwan |
16 | Air Pressure Gun and Hydraulic Gun Devices | - |
17 | Horizontal Adjustment Bearer | - |
18 | Technical Manual | - |
Packing Details: To be packed in wooden cases, suitable for export.
Delivery Details: 25~35 days after receipt of deposit
A: We are factory.
A: Generally it is 35 days, it is according to quantity.
A: NO.
A: T/T 30% with the order, the rest 70% of total amount T/T before.
If you have another question, pls feel free to contact us as below: