Mining Gold Trommel Wash Plant Rotary Scrubber for Sticky Clay Alluvial Gold Washing
Widely Used Alluvial Diamond With Sticky Clay Solution :
1.Separating : the flowsheet designed with several vibrating screen to separate the bigger particles that do not contain the diamond particle. The smaller one with diamond particles to next machine.
2.Washing:use the trommel scrubber to wash the clay, with the screen part of the trommel, it can separate two or three partcicles based on the mineral info.
3.Concentration: use jig machines for selecting the diamond concentrate.
Angola 200TPH Alluvial Diamond Processing Plant
Process: First use vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out, then to vibration screen. Vibration screen also for separator different size.Capacity is for 200 tons per hour First use backhoe get material to hopper, under hopper have a vibration feeder, vibration feeder can separator out +70mm size, then 0-70mm size to trommel scrubber, trommel scrubber is have two part, one part scrubber is for washing, one part screen is for separator different size. After trommel scrubber then to vibration screen, separator size again, then can use jig machine get diamond.Trommel scrubber is good for clay mine washing, some mine have much clay, if not washing first, the recovery rate is very lower.This 200 tons per hours diamond separator line is have working for one years, and it have get good effect, for now this customer want open a other 200 tons per hours line, our engineer have go mine site for inspect, first can check the existing line, most things is good, but also some details can make more perfect, Our factory is a progress factory, we need make the machine more and more perfect, beside check the existing line, also need check the new line, base the one new ore site, to choose the best machine.Not only diamond ore, our factory also can make gold ore machine line, chrome ore machine line, tin ore machine line, iron ore machine line, tantalum-niobium ores machine line and so on.2. High frequency vibrating screenSieve out several particle size based on the mineral info. & requirement.Advantages:1.high efficiency, low energy consumption;2.simple structure, convenient maintenance;3.fully closed structure without dust pollution;4.Stable working station and smooth operation;5.High utilization rate of screen, large unit area, not easy to block, but easy replacement of screen.3. Vibrating feederFeeding the material into next machine in equably.With China famous brand motor ,bearing etc. JXSC provide the high quality equipments for you. 4. Jig Machine
A gravity processing equipment. The dense particles are partially localized.Advantages 1. High concentration ratio and recovery ratio. 2. Easy to install, operate and maintain 3. Water conservation 4. The pulsation speed easy to adjust Model | Screen Size (MM) | Rotation Speed(R/Min) | Feeding size (mm) | Angle of inclination (degree) | Capacity (T/H) | Power (KW) |
JXSC-400 | ≤20 | 27.9 | ≤80 | ≤10 | 1-5 | 3 |
JXSC-600 | ≤25 | 27.6 | ≤80 | ≤10 | 5-10 | 5 |
JXSC-750 | ≤25 | 27.6 | ≤100 | ≤10 | 10-30 | 7.5 |
JXSC-900 | ≤25 | 27.6 | ≤100 | ≤10 | 30-50 | 11 |
JXSC-1200 | ≤25 | 17 | ≤160 | ≤10 | 50-70 | 15 |
JXSC-1500 | ≤50 | 16 | ≤230 | ≤10 | 70-100 | 30 |
JXSC-1800 | ≤50 | 16 | ≤230 | ≤10 | 100-150 | 37 |
JXSC-2100 | ≤50 | 16 | ≤230 | ≤10 | 150-180 | 45 |
Customer Mine SiteAlluvial Diamond Processing Plant in Angola
The plant including : Vibrating feeder , Trommel Scrubber and High Frequency vibrating screen.vibration feeder to feeding material to trommel scrubber, After trommel scrubber for washing clean, and separator big size out,then to vibration screen. Vibration screen also for separator different size.Capacity: 200TPH We have our engineer there for commisioning and installation guidance. Congo Rock Diamond Processing Plant
The plant including : Jaw crusher, Congo Crusher, Vibrating feeder , Trommel Scrubber and High Frequency vibrating screen. Jig Machines etc.Capacity: 200TPHOur engineer had go to the mining site for doing survey first before making the solution. The client are very satified about our solution and service.Packing and DeliveryWays of Packing:
1. Standard parts packed in the wooden cases.2. Big parts packed by plastic membrane.3. The whole machine is loaded in the container.Transportation:
1 .By sea or by air freight.
2. DHL/ UPS/ TNT/ FedEx
3. MSK/MSC/APL/EMC/WANHAI/KLINE