China Bioevopeak 50-20000ml Digital Display Heating Mantle, Find details about China Heating Mantle, Digital Display Heating Mantle from Bioevopeak 50-20000ml Digital Display Heating Mantle
1. PID Single Screen Temperature controller. Fast heating, temperature uniformity and high precise temperature control.
2. Several Rows type, produce as Customer inquiry, beautiful shape, easy to operate and effective.
3. PT100 Temperature sensor, with Adjustable Sensor Rack and Stainless Rods.
Model | HMD-1 | HMD-2 | HMD-5 | HMD-10 | HMD-20 | HMD-40 | HMD-60 | HMD-100 | HMD-200 | HMD-400 | |
Function | Capacity(ml) | 50 | 100 | 250 | 500 | 1000 | 2000 | 3000 | 5000 | 10000 | 20000 |
Heating Mode | Surface heat-conduction | ||||||||||
Surface Max.Temp.( ºC) | 450ºC | ||||||||||
Temperature control range | RT+20~250ºC | ||||||||||
Structure | Heating element | Nichrome wire | |||||||||
Shell(Insulation Layer) | High quality aluminum silicate cotton | ||||||||||
Heating power (kW) | 0.08 | 0.1 | 0.15 | 0.25 | 0.35 | 0.45 | 0.6 | 0.8 | 1.2 | 2.5 | |
Controller | Working Mode | Continuous | |||||||||
Specification | Exterior size (mm) | ¢220×165 | ¢280×220 | ¢330×230 | ¢340×245 | ¢350×250 | ¢425×320 | ¢470×340 | |||
Packing size (mm) | 230×230×195 | 290×290×300 | 340×340×350 | 360×360×300 | 390×390×310 | 430×430×350 | 510×510×380 | ||||
Voltage(V) | 100~120V or 200~240V | 200~240V | |||||||||
N.W. (Kg) | 2.5 | 5.5 | 6.5 | 7.5 | 8 | 9.8 | 16 | ||||
G.W. (Kg) | 2.8 | 6 | 7 | 8 | 9.2 | 12 | 20 |
LCD Digital Orbital Shaker Double layer steel Muffle Furnace
Multi-Position Hotplate Magnetic Stirrer Electrical LCD Digital Type Stirrer and Mixer
Q: How about quality of the goods?
A:
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.