AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter

China AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter, Find details about China Single Phase Energy Meter, Single Phase Power Meter from AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter

Model NO.
ADL200/CF
Measured Signal
Pulse Peak
Type
Energy Meter
Certification
CE
Customized
Customized
Input Voltage
220V/240V
Input Current
10(80)a
Frequency
50 or 60Hz
Screen
LCD
Warranty
2 Years
Certificate
CE,MID
Application
EV Charging Piles,Solar System,etc.
Optional Communication
RS485
Defaut Baud Rate
9600
Trademark
ACREL
Transport Package
Paper Carton
Specification
36*90*65mm
Origin
Jiangsu, China
HS Code
9028301300
Model NO.
ADL200/CF
Measured Signal
Pulse Peak
Type
Energy Meter
Certification
CE
Customized
Customized
Input Voltage
220V/240V
Input Current
10(80)a
Frequency
50 or 60Hz
Screen
LCD
Warranty
2 Years
Certificate
CE,MID
Application
EV Charging Piles,Solar System,etc.
Optional Communication
RS485
Defaut Baud Rate
9600
Trademark
ACREL
Transport Package
Paper Carton
Specification
36*90*65mm
Origin
Jiangsu, China
HS Code
9028301300

Product Description


ADL200  80A input multi tariff multifunction digital single phase power energy meter 

ADL200 single-phase electronic watt-hour meter is mainly used to measure single-phase active energy in low-voltage networks.

It can also measure voltage, current, power and other electricity. It can also be equipped with RS485 communication function to facilitate users to monitor, collect and manage electricity consumption.

It can be flexibly installed in the distribution box to realize the sub-item electric energy measurement, statistics and analysis of different areas and different loads.

The product meets the requirements of the national standard GB/T17215.321-2008 and the enterprise standard Q31/0114000129C035-2017 "Enterprise Standard for Rail Mounted Electric Energy Meters".


ADL200 single phase is applicable for inverters,ev charging piles,solar system,etc. equal to pilot SPM91 or estron SDM220

Functions and parameters
 
AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter

 

Functions of ACREL single phase energy kwh power meter

 
Rated U : AC220V

Rated I : AC10(80)A

Single-phase active kWh (positive and negative) bi-directional

Measure U,I,P,Q,S,PF,kWh,kvarh(Voltage, Current, Active power
, Reactive power, Apparent power, Power factor and Frequency

Sealable cover(phase and neutral terminals)

Accuracy:1

communication:Modbus RTU RS485

Function:multi tariff max demand 
Specification
 
 
 
Voltage
Reference voltage 
AC220V
Consumption 
<10VA
Impedance
>2MΩ
Accuracy
Error±0.2%
Current
Reference current
 10(80)A
Starting current
0.4%Ib
Consumption
<4VA
Power
Active, reactive, apparent power, error±1.0℅
Display
LCD
Frequency
45~65Hz
 
Option Function
Communication
RS485, Modbus-RTU protocol
 
Multi tariff energies
Adapt 4 time zones, 2 time interval lists, 14 time interval by day and 4 tariff rates;Max demanded kWh and time happened;Frozen data on last 48 month,last 90 days;
Operation Temperature
-25 ºC~+55 ºC
 
Storage Temperature
-40 ºC ~+70 ºC
Altitude
≤ 2000m
Relative humidity
≤95%RH, no condensation, without corrosive gas

Dimensions and Wirings

AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter
AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter
About ACREL


China manufacturer with over 18 years experience in energy meters



AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter
AC 80A Input Multi Tariff Multifunction Digital Single Phase Power Energy Meter

FAQ

Q:
Where is your company located?
 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.

 
A:Our headquarter is in Shanghai, our factory locates in Jiangyin,Jiangsu Province,China.It takes about 1 hour by car from Shanghai Hongqiao International Airport to our factory. As it is low labor cost here in Jiangsu,we can offer a better price with high quality.
 
Q:What's your lead time?
 
A:Sample time 1-3days,mass production 10~20days for order more than 500pcs
 
Q:Payment terms?
 
A:Usually,TT,credit card,western union,in cash and so on.You can also choose to pay 30% as deposit and the balance before shipment or against copy of B/L if the order is large.
 
Q:Can other logo be put on your products(ODM)?

A:Yes,but MOQ for ODM will be at least 5pcs.We also need you provide logo Ai Format or EPS.