Product Profile:
This press can realize tire loading, shaping, vulcanizing and unloading automatically. Tire can be cooled automatically with post cure inflator. It can adopt two-half mould and segmented mould.
Features:
§ Designed to handle bias and radial tires
§ Achieve optimal tire concentricity
§ Press Availability at benchmark level
§ Reduced wear, longer press life, improved cycle time and uniformity
§ No foundation, easier to maintain due to improved access to the important areas of press
§ Proven energy saving system, saving more 30% than the normal type.
Specification:
No | Name | Technology Parameter |
1 | Quantity | 12 units/group |
2 | Cavity quantity | 2 or 4 |
3 | Tire size | 10''-21'' |
4 | Tire section | 2.50''-6.00'' |
5 | Max. mold close force | 120T / mold |
6 | Press Oil cylinder | Model | Piston |
Press Oil Cylinder | 300x50, 2 pieces |
speed | 6mm/s |
7 | Lifting Oil Cylinder | Size | 63/45x1450 |
Speed | 110mm/s |
8 | Heating plate OD | Φ900mm |
9 | Mold height | 110-220mm |
10 | Green tire height | Max. 450mm |
11 | Heating plates space | 900mm |
12 | Center mechanism | Tr130*4teeth/inch(Tr95*4 teeth/inch) |
13 | Mold close speed | 100mm/s |
14 | Shaping steam Pressure | Not more than 0.3Mpa |
15 | Low press steam pressure | 0.8Mpa |
16 | High press steam pressure | 1.4Mpa |
17 | Media inside bladder | Steam/nitrogen |
18 | Curing tire quantity | 2 pcs/unit per time. 30 min /pcs,32 pcs/shift |
19 | Air pressure | 0.8Mpa |
20 | Pump motor power | 37KW, 1440rap |
21 | Control voltage | DC24V |
NOTE: Customized press according to your requirements
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.