GB Standard 0.5~20 T/H Steam Boiler for Industrial Applications

China GB Standard 0.5~20 T/H Steam Boiler for Industrial Applications, Find details about China Steam Boiler, Boiler from GB Standard 0.5~20 T/H Steam Boiler for Industrial Applications

Model NO.
WNS0.5-20
Drum Placement
Horizontal Boiler
Pressure
Pressure
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Rated Working Ressure
0.7~1.6 MPa (7 Bar ~16 Bar)
Boiler Capacity
35 Bhp~1400 Bhp
Applicable Fuel
Gas, Oil, Dual Fuel
Electricity Specification
3/380/50, 3/400/60, 3/440/60, 3/220/60
Shell Material
GB713 Q245r, Equal to Asme SA 516
Fire Tube Material
GB3087 20, Equal Toasme SA210
Boiler Structure
Horizontal
Design
3 Pass, Wet Back, Fire Tube
Insulation
Aluminium Silicate Wool
Protective Cladding
Stainless or Aluminium Sheet
Trademark
Devotion
Transport Package
Stretch Film & Wooden Cases
Specification
0.5 t/h ~ 20 t/h
Origin
Guangzhou
HS Code
84021900
Model NO.
WNS0.5-20
Drum Placement
Horizontal Boiler
Pressure
Pressure
Burning Style
Chamber Combustion Boiler
Usage
Industrial
Rated Working Ressure
0.7~1.6 MPa (7 Bar ~16 Bar)
Boiler Capacity
35 Bhp~1400 Bhp
Applicable Fuel
Gas, Oil, Dual Fuel
Electricity Specification
3/380/50, 3/400/60, 3/440/60, 3/220/60
Shell Material
GB713 Q245r, Equal to Asme SA 516
Fire Tube Material
GB3087 20, Equal Toasme SA210
Boiler Structure
Horizontal
Design
3 Pass, Wet Back, Fire Tube
Insulation
Aluminium Silicate Wool
Protective Cladding
Stainless or Aluminium Sheet
Trademark
Devotion
Transport Package
Stretch Film & Wooden Cases
Specification
0.5 t/h ~ 20 t/h
Origin
Guangzhou
HS Code
84021900
Production Applications
-providing steam for industrial applications
-providing hot water through heat exchanger
-providing steam and hot water for commercial applications like hotel, hospital, etc


THE MAIN FEATURES OF OUR BOILER
GB Standard 0.5~20 T/H Steam Boiler for Industrial Applications

 the features of other accessories like water feed pump, burner will be provided at soonest time upon inquiry
GB Standard 0.5~20 T/H Steam Boiler for Industrial Applications
FAQ
Q1: Where is your company?
A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.

Q2: What is the Warranty for the boilers?
A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. 

Q3: How about the installation and commissioning?
A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers.

 Q4: What's the production lead time for delivery?
A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc.

 Q5: What about your payment term?
A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount.
Q6: What kind of documents will be provided?
A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request.

 Q7: What's your MOQ?
A7: Only 1 set, if you have more than that, you will get a more favorable price.

 Q8: How's the packaging & shipping
A8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.