China Static Pressure Automatic Molding Line for Auto Parts/Construction Machinery, Find details about China Vacuum, Casting from Static Pressure Automatic Molding Line for Auto Parts/Construction Machinery
We are Prefessional casting production line manufacture from qingdao,china!
-Welcome friend all over the world come to our factory and discuss for business!
Technological process of casting production
Sand casting is the most popular and simplest type of casting, which has been used for centuries. Sand casting is used to make large parts such as gray cast iron, ductile iron, stainless steel and other types of steel. The main steps include painting, mold, core making, modeling, melting and pouring, cleaning, etc.
Related product Molding production line
Product Name
Static pressure molding Casting Production Line
The static pressure molding process introduction:
The static pressure molding process refers to the molding technology of air pre compaction and multi contact compaction. According to the compactness of molding sand, high pressure compaction or pre compaction and high pressure compaction can be selected. The static pressure molding process has the following characteristics:
-It can produce complex castings with high compactness, uniform compactness and high hardness;
-High dimensional precision and good surface roughness of castings;
-High modeling efficiency;
-High utilization rate of formwork;
-Good working conditions and less labor.
Technical information of the Molding machine
Model | Size of Sand Mould(mm) | Productivity(Mould/H) | Hardness of Sand Mould(N/CM2) | Total Power(Kw) |
Z416 | 600*480(120~150)
| 220-350 | ≥85 | 16.5 |
Z417 | 700*535(120~150) | 220-350 | ≥85 | 20 |
Z418 | 800*600(120~150) | 220-350 | ≥85 | 54 |
Z4110 | 1000*1000(120~150) | 220-350 | ≥85 | 70 |
Major equipment of the production line
Foundry molding machine
Core Shooter Making Machine
Furnace
Shakeouot Machine
Vibrating Conveyor
Magnetic Belt Conveyor
Suspension Separator
Hoist
Hexagonal Sieve
Fluidized bed
This is specially designed machine according to your specific requirement. From engineer designing to production completion, It needs about 45-50 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very begining to the end of production. Every machine will be fully assembled and carefully tested before shipment.
3. What's your machine quality guarantee?
Quality guarantee time is one year, we choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long will it take?
YES, we supply overseas service, but customer needs to pay for the engineers flight tickets and hotel foods.
Small machine usually takes within 5 days.
Big machine usually takes about 20 days.
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality, integrity and efficiency.
6. Warranty time
12 months from date of commissioning completion, but no more than 18 months from date of delivery.
7. Supply full english documents including foundation drawings, manual book, electric wiring diagram, electric manual book and maintenance book,etc.