Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line

China Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line, Find details about China Soda Can, Juice Can from Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line

Model NO.
GF
Processing Material
Agronomic Products
Process
Filling and Capping
Rated Output
8000 Bottles Per Hour
Volume
250-1500 Ml
Height of Can
80~135mm
Diameter of Can
45~70 mm
Suitable Cover
Standard Aluminum Cover
Number of Valve
18
Temperature of Filling
0-4 Temperature
Flow of Filling Valve
140~150ml/S
Number of Capping
4
Power of Motor
3 Kw
Consumption of CO2
120g/Hl
Overall Dimension
3150*1920*2700
Trademark
Fantas
Transport Package
Plywood Case
Specification
4500 kg
Origin
Zhangjiagang, China
HS Code
8422301090
Model NO.
GF
Processing Material
Agronomic Products
Process
Filling and Capping
Rated Output
8000 Bottles Per Hour
Volume
250-1500 Ml
Height of Can
80~135mm
Diameter of Can
45~70 mm
Suitable Cover
Standard Aluminum Cover
Number of Valve
18
Temperature of Filling
0-4 Temperature
Flow of Filling Valve
140~150ml/S
Number of Capping
4
Power of Motor
3 Kw
Consumption of CO2
120g/Hl
Overall Dimension
3150*1920*2700
Trademark
Fantas
Transport Package
Plywood Case
Specification
4500 kg
Origin
Zhangjiagang, China
HS Code
8422301090
2 in 1 Equal Pressure Filling Capping Machine for Can
Our company introduces the filling and sealing technology of Swiss company. After digestion and absorption, we design and manufacture the can filling and cappingmachine, which can be widely used in the filling and capping of gas drinks, beer and other cans. It is widely used for filling and capping of aluminum cans, tinplate cans and PET cans. The machine has stable performance, advanced technology, beautiful shape and complete functions.

 
Technical Features
1. Filling Part
Our company introduces German technology, designing and manufacturing by ourselves.Uses the principle of equal pressure filling, so as to fill the liquid into the washed bottles sent by the bottle washing machine.
The filling valve adopts constant pressure mechanical valve, which makes the filling process quick and sensitive, with high precision of filling liquid level.
It has perfect CIP cleaning function.
Combine filling valve mouth with guide device and bottle supporting cylinder lifting device to ensure the accurate sealing of the bottle mouth and filling valve. It can reduce the leakage of materials from the can mouth.
According to the different height of the tank, it can achieve manual lifting to meet the filling requirements.
Adopt gear transmission, which has high efficiency, low noise, long service life, convenient maintenance and sufficient lubrication. Use frequency converter to control the main motor speed of the machine. The machine adopts stepless frequency control.
The structure of the bottle guiding system is simple, which can be changed quickly and conveniently according to the type of the can. The whole machine adopts the structure of supporting the bottom of the can for conveying.
The whole machine is controlled automatically by PLC. Faults are displayed online, such as bottle blocking, cover lacking, etc.
It has the safety protection functions of shutdown when there is no cap. When there is no can, it won't open valve and make cap.
The material in the filling cylinder is automatically controlled.The liquid level height is detected by the liquid level sensor to ensure the stability of liquid level and the reliability of filling.
The key parts and electrical components of this machine are imported products.
Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line
 
2. Capping Part
Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line
 
The lid is sealed on the can of the filled product and sent to the next process by the conveyor chain.
The sealing roller is made of high hardness alloy quenched material (HRC > 62). The sealing curve is precisely processed by optical curve grinding to ensure the sealing quality and normal operation of the machine.
This machine has a control system that there is no sealing when there is no can. This can ensure the normal operation of the machine and reduce the cover loss rate.
The aluminum cover is manually placed in the chute, and the cover is put by the gravity and the thruster. The chute is equipped with a detection switch to ensure that the machine can stop when the cover is missing.
According to the different height of the can, the capping machine can be manually lifted to meet the requirements.


Technical Parameters
Item 
Rated Output(335 ml)8000BPH
Height of Can80~135mm
Diameter of Canф45~70 mm
Suitable CanCan
Suitable CoverStandard Aluminum Cover
Number of Valve18
Temperature of Filling0~4ºC
Flow of Filling Valve140~150ml/s
Number of Capping4
Power of Motor3KW
Consumption of CO2120g/hl
Consumption of Compressed Air (0.6Mpa)m³/min0.05m 3/min(at 0.6MPa)
Overall Dimension (mm)3150×1920×2700
Total Weight (Ton)4.5
 

Specifications
NoItemIndustry StandardOur Standard
1Filling Tolerance±2.5mm±2mm
2Qualified Rate of Filling≥85%≥93%
3Liquid Loss Rate≤1%≤0.8%
4Can Damage Rate≤1%≤0.8%
5Cap Damage Rate≤1.2%≤1%
6Qualified Rate of Capping≥99%≥99.5%
Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line
Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line

FAQ
1. Q: Are you a trading company or a manufactory?
We are a manufacturer of more than 10 years production; we supply the factory price with goodquality and sincere service.

2. Q: When Can I get my machine after I paid?
Normally production time is around 30-60days, the exact delivery depends onwhat kind of machine you order. The shipping time is based on your destination.

3. Q:How to install my machines when it arrives? How much the cost?

You can arrange engineers to study in our factory or our experienced engineers could go to your factory to install the machines and train your staff how to operate the machines. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

4. Q: How long time for installation?
According your machines order, we will send one or two engineers to your factory. It will take about 10 days to 25 day. Mainly depend on the project capacity.

5. Q: What is your guarantee if we buy your machines?
We offer you high quality machines with 24 months guarantee and supply life-longtechnical support. And we will send free spare parts together with machines bycontainer. During the warranty time, we will supply thespare parts with our cost.



Please feel free to contact me if you have any questions.
Carbonated Beverage Beer Energy Can Filling Machine for Aluminum Beverage Cans Production Line