Nonwoven Drying Oven Machine for Sintepon

China Nonwoven Drying Oven Machine for Sintepon, Find details about China Non Woven Production Line, Nonwoven Fabric Production Line from Nonwoven Drying Oven Machine for Sintepon

Model NO.
PET
Brand
a.L(Aolong)
Raw Material
Polypropylene
Power
10-1000kw
Color
Customer Request
Applicable Industries
Building Material Shops
Speed
16 M/Min
Weight
According to The Width
Dimension(L*W*H)
Size Determined by Customer
Voltage
220/380V
After-Sales Service Provided
Free Spare Parts
Width
2000-8000mm
Product Name
Nonwoven Drying Oven Machine for Sintepon
Keywords
Nonwoven Oven
Technology
Drying Oven
Trademark
ALnonwoven
Transport Package
Nude Packing or According
Origin
Zhejiang, China
Model NO.
PET
Brand
a.L(Aolong)
Raw Material
Polypropylene
Power
10-1000kw
Color
Customer Request
Applicable Industries
Building Material Shops
Speed
16 M/Min
Weight
According to The Width
Dimension(L*W*H)
Size Determined by Customer
Voltage
220/380V
After-Sales Service Provided
Free Spare Parts
Width
2000-8000mm
Product Name
Nonwoven Drying Oven Machine for Sintepon
Keywords
Nonwoven Oven
Technology
Drying Oven
Trademark
ALnonwoven
Transport Package
Nude Packing or According
Origin
Zhejiang, China
Nonwoven Drying Oven Machine for Sintepon
 Machine width :2600-3800mm
 Chamber length :4800-6000mm
 Heating method :circulated hot oil direct burning 

 Working speed :<15m/min
Nonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for SinteponNonwoven Drying Oven Machine for Sintepon
FAQ

 1,The warranty period shall be valid for 12 months after completion of the commissioning.
 2,During the warranty period, if any defect and fault is discovered, QiRong grants a
 3,prompt action to solve the problem.
 Installation & maintenance
 1,we will send one or two engineers to the Buyer's factory to help the Buyer to do the
 2,nstallation and commissioning of the line at the request of the Buyer. The Buyer should
 3,provide the allowance , round-trip air tickets, accommodation, workers and translator.
 The installation and commissioning will take around 1 month.