China Luxury Roofing Materials Steel Structure Prefab Houses Hotels, Find details about China Prefab House, Roofing Materials from Luxury Roofing Materials Steel Structure Prefab Houses Hotels
Steel structure frame Buildings from Qingdao Taiwei Steel Structure Co., Ltd. | ||
Advantages | 1. Lower cost but Nice appearance 2. Easy to assemble and dismantle 3. Time saved, Cost saved, 50years durable use 4. Quality Certificated---ISO9001 5. Installation with instruction of experienced engineers | |
Main components | Base | Cement and steel foundation bolts |
Main frame | H-section steel | |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C / Z Steel: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strenth bolt | |
Roof & wall | Sandwich panel or Single steel sheet | |
Door | Sliding door / Rolling door / Securing door | |
Window | Aluminium alloy frame | |
Surface | Total four lays of Anti-rust Painting or Galvanized | |
Sheet | 0.5mm or 0.6mm galvanized sheet | |
Accessories | Semi-transparent skylight belts, Ventilators, down pipe, Glavanized gutter, etc | |
Application | 1. workshop, warehouse, garage,shed, hanger 2. steel building, metal building, modular house 3. Steel H-column and steel H-beam 4. Portal frame products 5. High rise building project 6. Others steel structure buildings materials | |
Packing | Main steel frame without packing load in 40' OT, roof and wall panel load in 40' HQ! | |
Drawing | AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. to design drawing as your plan | |
Design Parameters (IMPORTANT) | If you need our design, please offer the following parameters to confirm: | |
1, Project location(country/area) | ||
2, Size(Length×Width×Height cm) | ||
3, Snow load (Max. snow height mm Kn/m2 ) | ||
4, Wind load (Max. Wind speed Kn/m2 km/h m/s) | ||
5, Seismic magnitude | ||
6, Middle Column allowed or not | ||
7, Brickwall allowed or not (cm) | ||
8, Door&Window Quantity&Size | ||
9, Crane allowed or not |