China 8011/H22 Hydrophilic Aluminum Fin Stock for Air Conditioning, Find details about China Hydrophilic Aluminium Fin, Hydrophilic Aluminium Fin Stock from 8011/H22 Hydrophilic Aluminum Fin Stock for Air Conditioning
Alloy | Temper | Mechanical performance under room temperature | ||
Tensile (Mpa) | Elongation (e%) | Erichson (IE,mm) | ||
1100 1200 8011 | O | 80~110 | ≥ 20 | ≥ 6.0 |
H22 | 100~135 | ≥ 16 | ≥ 5.5 | |
H24 | 115~145 | ≥ 12 | ≥ 5.0 | |
H26 | 125~160 | ≥ 8 | ≥ 4.0 | |
H18 | ≥ 160 | ≥ 1 | - | |
Re: if customers have special requirements, please idicate them in purchase order. |
Thickness and tolerance | Width and tolerance | Core ID | Max OD for finish products | Core material |
0.08~0.20 +/- 0.005 | 100~1100 +/- 0.5 | Φ76 Φ152 Φ505 | Φ ≤ 1200 | Paper Aluminium Steel |
No. | Item Index | Technique Index | |
1 | Film Thickness | 1.0~2.0 um (single side average thickness) | |
2 | Hydrophile | Primary contact angle | Primary contact angle ≤ 10° |
Continuous contact | Continuous contact ≤ 20° | ||
3 | Adherence | Erichson test (press deeply to 5mm): no peeling Gridding test(100/100): no plunger separation | |
4 | Corrosion Resistance | R.N ≥ 9.5 Salt spray test (72 hours) | |
5 | Alkali Resistance | Dipped in 20% NaOH in 20 ºC for 3 minutes, absolutely no blister | |
6 | Impregnant Resistance | Samples weight loss 1% | |
7 | Heat Resistance | Under 200 ºC, for 5 minutes, performance and colour unchanged Under 300 ºC, for 5 minutes, the coating film becomes a little yellow | |
8 | Oil proof | Dip in volatile oil for 24 hours, no blisters on the coating film | |
9 | Odor of the coating film | No odor | |
10 | Abrasion to mould | Same as ordinary aluminium foil |
Q. Are you factory?
A.We are aluminium coil factory.
Q.Does the packaging safe and arrive in good conditions?
A.Yes, Safe Packing guarrantee, all the products will arrive your door under good conditions.
We response to problem of shipping if there unfortunately is.
Q. Do you have any certificates ?
A.Our products passed inspection of SGS, FDA,ISO Quality is priority!Every worker keeps the QC from the very beginning to the very end,Quality control department especially responsible for quality checking in each process.
Q: How long is your delivery time?
A: Generally it is 15-25 days, it is according to your quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A:T/T,L/C,D/A,D/P are can acceptance