ASTM A355 P11 Seamless Carbon Steel Pipe for Construction

China ASTM A355 P11 Seamless Carbon Steel Pipe for Construction, Find details about China A53 Steel Tube, Alloy Steel Pipe from ASTM A355 P11 Seamless Carbon Steel Pipe for Construction

Product Name
Ss400 Thick Wall Seamless Steel Pipe
Keyword1
Ss400 Pipe
Keyword2
Thick Wall Pipe
Other Name
Carbon Steel Tube
Od
21.3mm-710mm
Wt
4-120mm
Length
Fix Length
Standard
ISO9001
Packing
Steel Tape, Tear, Spray Paint
Shipping Port
Qingdao, Tianjin, Shanghai
Main Market
Europe, Austrilia, Middle East and So on
Payment
Tt LC Dp Ect
Technolgy1
High Precision Hot Rolled
Technolgy2
Cold Drawn
Surface
Black Painting
Transport Package
Bundle
Origin
China
HS Code
73041990
Product Name
Ss400 Thick Wall Seamless Steel Pipe
Keyword1
Ss400 Pipe
Keyword2
Thick Wall Pipe
Other Name
Carbon Steel Tube
Od
21.3mm-710mm
Wt
4-120mm
Length
Fix Length
Standard
ISO9001
Packing
Steel Tape, Tear, Spray Paint
Shipping Port
Qingdao, Tianjin, Shanghai
Main Market
Europe, Austrilia, Middle East and So on
Payment
Tt LC Dp Ect
Technolgy1
High Precision Hot Rolled
Technolgy2
Cold Drawn
Surface
Black Painting
Transport Package
Bundle
Origin
China
HS Code
73041990
CASTM A355 seamless alloy steel pipe for construction
OD21.3MM-710MM
Thickness3-108mm
Steel MaterialP11/P9/22
StandardAPI 5L PLS 1 & PLS 2, A53,A106,A333,A671,A179,A192,A210,S37,ST52,EN10217,EN10219,EN10224,JIS G3444 ETC
UsageOil Pipe, Casing Tube, Line Pipe and Fluid (Water, Gas) Transmission, Boiler Pipe
SurfaceBared Black Painting, Anti-Corrosion Coating,Galvanized etc
ProctorPlastic cap

ASTM A355 P11 Seamless Carbon Steel Pipe for Construction

ASTM A355 P11 Seamless Carbon Steel Pipe for Construction
ASTM A355 P11 Seamless Carbon Steel Pipe for Construction
ASTM A355 P11 Seamless Carbon Steel Pipe for Construction
ASTM A355 P11 Seamless Carbon Steel Pipe for Construction

ASTM A355 P11 Seamless Carbon Steel Pipe for Construction

ASTM A355 P11 Seamless Carbon Steel Pipe for Construction
ASTM A355 P11 Seamless Carbon Steel Pipe for Construction


FAQ

1. Q: What is your delivery time?

   A: As normally, it is 25~60 days after you confirm the order. If your order is urgent, we would like to try our best to meet your requests.

2. Q: What is your main payment term?

   A: They are T/T and L/C. Like 30% advance payment via T/T, balance pay after receiving copy BL; 100% irrevocable L/C at sight. If you have any other requests, we can talk to it again.

3.Q: What is your main market?

  A: Chile, India, Korea, Pakistan, Turkey, Iran, Australian and so on.

4. Q: Why we choose you as our supplier? 

   A: All of our clients have reorders from us. Give us one order, you can feel our price, quality, and service. Then, you will know us.