40mm Placon Roller Track for Pipe /Roller System/Spare Parts

China 40mm Placon Roller Track for Pipe /Roller System/Spare Parts, Find details about China Aluminum Tube, Aluminum Roller from 40mm Placon Roller Track for Pipe /Roller System/Spare Parts

Model NO.
AL-2045A
Trademark
king 9
Origin
China
HS Code
7610900
Model NO.
AL-2045A
Trademark
king 9
Origin
China
HS Code
7610900
Product Description:
Roller Track for Pipe Rack System

Roller track are used mainly for the safe movement of transport boxes and cartons in flow racking.The rolles are made of premium quality, robust, impact resistant thermoplastic, It absorbs no damp and is resistant to acids and leaches,.
These rollers, on steel axies, are available as standard or as flanged rollers.
The roller track frame is cold formed zinc plated steel 1.5mm thick
Item NOOD of wheel33mm MaterialAluminum
AL-2045AL.W4000mm.40mm Colorwhite/yellow/esd black
Weight0.5kg/m Package4pcs


40mm Placon Roller Track for Pipe /Roller System/Spare Parts
40mm Placon Roller Track for Pipe /Roller System/Spare Parts
40mm Placon Roller Track for Pipe /Roller System/Spare Parts





FAQ:

Q1: Are you manufacturer ?
A: Yes,We are manufacture since from 2000, is a well-known company with good reputation in China even Asia.

Q2: If I need sample, could you support?
A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect.

Q3: How do you pack your product?
A: Packing steps for aluminum windows:
Step 1.Protective tape protects frames from scratches;
Step 2.Keep windows fixed on iron pallets;
Step 3.Tie up windows on the iron pallets with plastic belts;
Step 4.PE films keep windows away from sea water;
Step 5.Fill in the space between each two iron pallets by air bags;
Step 6.Tie up iron pallets in container with plastic belts.
Our packages will ensure the windows arrive at project jobsite in good conditions

Q4: What's your payment term?
A: For the fist order, we usually use 30% T/T deposit + 70% T/T before loading the container. For future order, we can do 30% T/T deposit + 70% T/T balance against B/L copy.