Pulverized Coal Fired Burner for Boiler Refurbishing

China Pulverized Coal Fired Burner for Boiler Refurbishing, Find details about China Coal Powder Burner, Coal Burner from Pulverized Coal Fired Burner for Boiler Refurbishing

Mining Object
Pulverize Coal Burner
After Sale Servic
Oversea Engineer Service Available
Energy Saving
Energy Saving
Trademark
WHAJ
Transport Package
Standard Export Package
Specification
According to Drawing
Origin
Wuhan
Mining Object
Pulverize Coal Burner
After Sale Servic
Oversea Engineer Service Available
Energy Saving
Energy Saving
Trademark
WHAJ
Transport Package
Standard Export Package
Specification
According to Drawing
Origin
Wuhan

The industry features of dual swirl pulverized coal burner

1. The coal consumption is decreased by 30%;

2. The consumption-efficiency >97%;

3. The slag contains<1%;

4. The burn-off rate>99%;

5. The ash emission<50mg/m³when adding a dust collector;

6. Coal flexibility, easy operation;

7. High temperature resistance and wear resistance.

 

The primary and secondary air velocity for coal furnace

 

Coal type

Hard Coal 

Lean Coal

Soft coal

Brown Coal

Burner

 

 

Type

Direct wind

Primary air

20-25

20-26

25-35

18-30

Secondary air

45-55

45-55

40-55

40-60

Whirl wind

Primary air

12-16   

16-20

20-26

20-24

Secondary air

15-22   

20-25

30-40

25-35

 

Production list

NO.

Model

Technical data

Minimal Coal consumption(Kg/H)

Maximal Coal consumption(Kg/H)

Size

Weight(kg)

1

LZ-200

Burn-off rate:99%

100

 

250

Φ307×

1021

56

2

LZ-300

Burn-off rate:99%

200

 

600

Φ350×

1196

85

3

LZ-400

Burn-off rate:99%

400

 

1200

Φ400×

1316

145

4

LZ-600

Burn-off rate:99%

600

 

2400

Φ460×

1532

245

5

LZ-800

Burn-off rate:99%

1000

 

4500

Φ545×

1625

420


Production process
Pulverized Coal Fired Burner for Boiler Refurbishing


Our project:
Pulverized Coal Fired Burner for Boiler Refurbishing