Span Preformed Guy Dead End Grips

China Span Preformed Guy Dead End Grips, Find details about China Clamp, Conductor from Span Preformed Guy Dead End Grips

Model NO.
RLB
Breaking Load
70-100
Shackle
Galvanized Steel, 0.4kg
Housing
Aluminum Alloy, 0.5kg
Shark
Aluminum Alloy
Insert
Rubber, 0.3kg
Outer Armor Rods
Aluminum Alloy
Inner Armor Rods
Aluminum Alloy
Sales Method
Complete Sets
Product
Hot-DIP Galvanized Steel Bolts for Cables
Trademark
Reliable
Specification
Customized
Origin
China
Model NO.
RLB
Breaking Load
70-100
Shackle
Galvanized Steel, 0.4kg
Housing
Aluminum Alloy, 0.5kg
Shark
Aluminum Alloy
Insert
Rubber, 0.3kg
Outer Armor Rods
Aluminum Alloy
Inner Armor Rods
Aluminum Alloy
Sales Method
Complete Sets
Product
Hot-DIP Galvanized Steel Bolts for Cables
Trademark
Reliable
Specification
Customized
Origin
China
Span Preformed Guy Dead End Grips


Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips


Span Preformed Guy Dead End Grips


Definition:
Fastening fixture for tower: a series of fastening fixture for tower is designed according to the dimension of tower material at the hanging point of fiber optic cable to realize the connection and installation of tension-resistant wire clip and suspension wire clip with iron tower

Fastening fixture for rod: according to the cable hanging point rod diameter design series of fastening fixture for rod, realize the connection and installation of tension-resistant wire clip and suspension wire clip and pole

Specification & Parameter:
modelScope of applicationWeightMaterialBreaking Load
tangent towerUsed for the main material size of cable hanging point≤80mm3.0A3 steel70
Used for the main material size of cable hanging point81mm~200mm3.4~5.070
angle towerUsed for the main material size of cable hanging point≤100mm3.7100
Used for the main material size of cable hanging point101mm~200mm4.0~4.9100
For rodUsed to installφ190~φ4003.0~5.470




Packing :  

• Packing: Generally packed in standard wooden case and pallets if needed, or as customized;
• Shipping: Around two weeks after payment as stipulated in contract.
Span Preformed Guy Dead End Grips

Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips
Span Preformed Guy Dead End Grips