China Hand-Pushing Multi-Heads Concrete Floor Scabbler, Find details about China Concrete Floor Scabbling, Pneumatic Chisel from Hand-Pushing Multi-Heads Concrete Floor Scabbler
Description of Multi- head concrete Floor Scabblers:
Hand pushing concrete floor Scabbler is used to remove cement tower and floor coat of concrete road and bridge with high hardness allowy bush hammer.
2.Hand pushing concrete floor Scabbler not only improves the work efficiency and quality and make the face to achieve uniform roughness,to remove surface laitance strong pavement concrete after binding.
3.Hand pushing concrete floor Scabbler is made of quality hardness alloy bush hammer, strong impact, and long life.
The most widely recognized item of Concrete Surface Preparation equipment, also described as a Scabbler, Groover or Scarifier. Typical uses include reducing screeds and levels, commonly referred to as planing; removal of coatings, line markings & membranes; texturing and grooving surfaces, often to increase Slip Resistance; removal of laitance and surface deposits, including ice in cold stores.
machine type | ZTMS-11A | ZTMS-15A | ZTMS-23A |
weight | 80KG | 108KG | 156KG |
Working width | 1260mm | 1260mm | 1260mm |
B.P.M The number of hammers per minute | 2200*11 | 2200*15 | 2200*23 |
Air consumption | 500l/min | 700l/min | 900l/min |
The noise level is decibel | 56db | 56db | 56db |
Vibration Level Mean Equivalent | 4.96 Square meter per second | 4.96 Square meter per second | 4.96 Square meter per second |
Air compressor matching requirements | Pressure of 5 kg / cm,Displacement of 0.8 cubic meters / min | Pressure of 5 kg / cm,Displacement of 0.8 cubic meters / min | Pressure of 5 kg / cm,Displacement of 1.0 cubic meters / min |
Speak concrete mark concrete mark | Work efficiency | Work efficiency | Work efficiency |
C50 concrete | 25-30 square meters / hour @ 1-3 mm | 40-50 square meters per hour @ 1-3 millimeters | 50-60 square meters per hour @ 1-3 millimeters |
C40 concrete | 32-37 square meters per hour @ 1-3 millimeters | 50-60 square meters per hour @ 1-3 millimeters | 60-70 square meters per hour @ 1-3 millimeters |
C30 concrete | 40-45square meters / sales @ 1-3 mm | 60-70 square meters per hour @ 1-3 millimeters | 70-80 square meters per hour @ 1-3 millimeters |