0.14mm-0.8mm DX51D Prepainted Galvanized Steel Coil PPGI with SGS
Pre-painted galvanized steel coil
Color coated galvanized steel coil
PPGI Steel Coil
PPGI Description:
1. Thickness: 0.14mm-0.8mm
2. Width: 600-1250mm
3. Zinc coating: 30g/m2-180g/m2
4. Top/back paint: 15-25um/5-7um
5. Surface: chromed, dry, unoil, skin pass
6. Color: all RAL as clients requirement
7. Coil weight: 3-8 tons
8. Coil ID: 508mm
9. Standards: AISI, ASTM, BS, DIN, GB, JIS
10. Grades: DX51D+Z, SGCC, SGHC, CGCC Q235 Q195 Q215
11. Payment: TT or LC at sight
12. Package: plastic bag + waterproof paper + steel sheet with strip
13. Delivery time: 15-45 days after receipt of 20% TT
PPGI Prepainted Galvanized Steel Coil: total coil
Color Coated Steel Coil PPGI: finish coil
PPGI Summary Description:
Thickness | 0.14mm-0.8mm |
Width | Width: 600mm-1250mm |
Type of coating: | PE, SMP, PVDF |
Zinc coating | 30g/m2-180g/m2 |
Top/Back Paint | 15-25um/5-7um |
Coil ID | 508mm |
Coil weight: | 3--8MT |
Price terms | FOB, CFR, CIF |
Payment terms | TT or LC at sight |
delivery time | 15-45 days after receipt of 30% TT |
TEST | SGS BV COC… ISO |
Standard | ASTM JIS GB AISI DIN… SGCC SGCH DX51D |
Company Description:
Liaocheng Xinzheng Steel Co.,Ltd
Main:
Galvanized Steel Coil and Sheet(0.12mm-0.8mm-3.0mm)
Galvalume Steel Coil and Sheet(0.14mm-0.8mm)
Color Coated Steel Coil(0.13mm-0.8mm)
Corrugated Sheet(0.12mm-0.8mm)
High Quality with Reasonable Quotation
Fast Delivery Time
The production will be supervised for 25hours
Factory Production Line: galvanized steel coil part
Welcome to visit us:
Guanxian Town, Liaocheng City, Shandong, China
From Jinan West Station to our factory, it needs 3hours by car
From Liaocheng Station to our factory, it needs 1-2hours by car
From Beijing Station to Jinan Station, it needs 1-2hours by speed train
From Beijng Station to Handan Station, it needs 2hours by speed train, from Handan station to our factory, it needs 1-2hours by car only.
From Jinan Station to Shanghai Station, it needs 3-4hours by speed train, from Jinan to our factory, it needs 3hours by car