China Quality Fire Proof Steel Door Manufacturer, Find details about China Steel Fire Proof Door, UL Certificate Fire Rated Door from Quality Fire Proof Steel Door Manufacturer
Product Specifications | |
Brand | Xunzhong |
Certifications | UL NUM(R39532/R39533) |
Filler Material | Honey Core, Mineral rock wool, polyurethane core. |
Fire rated time | 1 hour up to 3 hours. |
Size | Maximum size is (2530x2530mm) |
Door leaf sheet | 22 Ga. - 18 Ga. (0.8/1.0/1.2 mm)galvanized steel/cold roll steel |
Door frame sheet | 16 Ga. - 14 Ga. (1.5mm-2.0mm). cold roll steel/galvanized steel |
Surface finish | Door leaf and frame powder coated finish. |
Frame depth | 115mm - 240mm |
Opening | Swing Inward / Outward |
Color | RAL color system, could be customized as well. |
Accessories | Lock,handle,hinges,door closer,panic bar and other as requested. |
Vision Panel | With or without as requested. |
Lite Frame | UL listed lite frame. (UL Number: 39534) |
Louver | With or without as requested. |
Feature | Fire proof and thermal insulation. |
Application | Suitable for building project, business, home decoration(Office, hotel, church, home and so on.) |
Package | wooden pallets |
MOQ | 1 Set |
FAQ
Q1: Are you a manufacturer of fire doors?
A:Yes ,we are. Offering excellent and various goods at competitive price is what we have been keeping doing.
Q2: What kind of Certification did you pass?
A: After relevant institution of professional evaluation, we're qualified for UL, CE, ISO9001, BV, ROHS, etc.
For wooden fire doors, we are qualified for BS-476, EN-1634, UL-10C.
Q3: How can you guarantee your final quality?
A: As for quality control, we've approved four testing procedures:
Initial inspection, re-inspection, final inspection and sampling inspection.
Q4: How is the MOQ of required?
A: We welcome any amount under your requested. but a competitive price is always depends on the quantity increase gradually.
Q5: How long is the production lead time?
A: Usually, T/T 50% deposit to start production, the balance paid before shipping. Lead time about 15-25 days.