200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System

China 200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System, Find details about China Biogas Desulphurization, Biogas Desulfurization from 200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System

Model NO.
ALBS300
Tank Material
Stainless Steel 304 or Carbon Steel
Blower
Anti-Explosion, Variable Frequency Motor
Connection Pipes
PVC or Stainless Steel Pipes
Auxiliary
Pressure Guage, H2s Sensor, Ss Flange,etc
Trademark
ALONG BIOGAS
Transport Package
LCL or FCL
Specification
Complete System
Origin
China
HS Code
8486909000
Model NO.
ALBS300
Tank Material
Stainless Steel 304 or Carbon Steel
Blower
Anti-Explosion, Variable Frequency Motor
Connection Pipes
PVC or Stainless Steel Pipes
Auxiliary
Pressure Guage, H2s Sensor, Ss Flange,etc
Trademark
ALONG BIOGAS
Transport Package
LCL or FCL
Specification
Complete System
Origin
China
HS Code
8486909000
200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System
Material option: Cast iron, Stainless steel 304


Our GasCle system is for the pre-treatment of raw biogas from anaerobic reactor, suitable for biogas flow 20 ~ 500 Nm³/hr. The raw biogas from digester always contains saturated water vapor, physical impurities and hydrogen sulfide. These substances should be removed before the utilization of biogas, to avoid damage to generator, burner of boiler and torch or other equipment.

The GasCle system is skid mounted in combination of multiple functional units, or individually installed at project site.

GasCle system has the following modules:
1.  Primary filter (optional)
For preliminary removal of physical impurities and saturated water vapor;
2.  Desulphurization tank.
For reducing the hydrogen sulfide content in biogas, to meet the requirements of follow-up equipment;
3.  Secondary filter.
For Precise removal of physical impurities in the biogas and moisture;
4.  Biogas blower
Increasing biogas pressure for transportation and meed the requirement of follow-up equipment for gas intake pressure;
5.  Electrical control system
Equipped with VFD(variable frequency drive) and LCD touch screen.
- Pressure gauge and H2S analyzer(Optional).
-  Pipes, valves and base frame.

200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System
GasCle system has the following functions:
1.  Desulfurization
Hydrogen sulfide can be reduced to 50ppm or less;
2.  Dehydration
Removal of saturated water vapor;
3.  Impurity removal.
Removal of physical impurities and volatile matter of desulphurizer agent;
4.  Pressure increasing
Increment could reach 39.8 kPa or even higher;
5. Pressure stabilization
Stabilizing gas outlet pressure at a fixed value to meet the gas intake pressure requirement of the follow-up equipment;
6.  Measurement of Pressure and hydrogen sulfide content (optional);
7.  Digital display.
Pressure setpoint, gas outlet pressure, motor frequency, motor speed, motor current, output torque, bus voltage, output voltage, power consumption and system operation time would be indicated on the LCD display.



200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System200m2/H Biogas Pre-Treatment System Desulfurization Purification Tower System