Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

China Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar, Find details about China Steel Building, Steel Construction from Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

Model NO.
WISKIND
Material Grade
Q235B/Q345b
Painting
Ep/PU/Alkyd Paint
Roof and Wall Cladding
Sandwich Panel or Colored Corrugated Plate
Insulation
PU/PIR/EPS/Rock Wool/Fiberglass Wool, etc.
Door
Sliding Door or Rolling Door
Windows
PVC/Plastic Steel/Aluminum Alloy Window
Drainage
Gutter and Downpipe
Drawing Software
X-Steel/Autocad
Trademark
Wiskind
Transport Package
Sea Worthy Packing in Container
Specification
As customer requirement
Origin
Shandong, China
HS Code
9406900090
Model NO.
WISKIND
Material Grade
Q235B/Q345b
Painting
Ep/PU/Alkyd Paint
Roof and Wall Cladding
Sandwich Panel or Colored Corrugated Plate
Insulation
PU/PIR/EPS/Rock Wool/Fiberglass Wool, etc.
Door
Sliding Door or Rolling Door
Windows
PVC/Plastic Steel/Aluminum Alloy Window
Drainage
Gutter and Downpipe
Drawing Software
X-Steel/Autocad
Trademark
Wiskind
Transport Package
Sea Worthy Packing in Container
Specification
As customer requirement
Origin
Shandong, China
HS Code
9406900090

Large-Span PEB Steel Structure for Warehouse / Workshop / Garage / Hangar

Product Application Scope:

The steel workshop warehouse building is widely used for workshop plant, warehouse, office building, steel shed, aircraft hangar etc.

Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

Pefabricated Warehouse Building Specification: 

Main structure

Welded H Section or Hot rolled H section steel, Q235, Q345

Purlin

C Section or Z Section, Q235

Roof/Wall Cladding

Corrugated plate,PU,EPS,Rock Wool,Fiber Glass sandwich panel

Tie bar

Q235 Round Steel Tube

Brace

Q235 angle steel, round bar or steel pipe

Knee Brace

Q235 Angle Steel

Roof Gutter

Color Steel Sheet

Rain spout

PVC Pipe

Door

Sliding Sandwich Panel Door or Metal rolling door

Windows

PVC/Plastic Steel/Aluminum Alloy Window

Connecting

High Strengthen Bolts, Normal bolts with nuts

Packing

As per your request, loaded into 40'GP/OT, 20'GP, 40'HQ

Drawing

We can make the design and quotation according to your detailed conditions or as per your drawin

Advantages of Light Steel Structure Construction

I. Wide span: Single span or multiple spans, the max span is over 70 m without middle column.

II. Low cost: Unit price range from USD45/sqm to USD80/sqm according to customers' request.

III. Fast construction and easy installation.

IV. Long using life: Up to 50 years.

V. Others: Environmental protection, stable structure, earthquake proofing, water proofing, and energy conserving.

Our Roof and  Wall System

Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar
Our Services                                                                                                                      

1,Drawing: We have a high-efficiency design team. If you provide us the information about the building ,for example : snow load, wind load ,the grade of earthquake,you can get a piece of  detailed drawing.

2,Installation: We can send our engineer to on-site of the building and our engineer will guide the installation .
Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

If you are interested in our portal steel structure , please give us the following information:

1 Location (where will be built? ) _____country, area

2 Size: Length*width*height _____mm*_____mm*_____mm

3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4 snow load (max. Snow height)____kn/m2, _____mm

5 anti-earthquake _____level

6 brickwall needed or not If yes, 1.2m high or 1.5m high

7 thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.

8 door quantity & size _____units, _____(width)mm*_____(height)mm

9 window quanity & size _____units, _____(width)mm*_____(height)mm

10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height ___m.

About Us                                                                                                                     

We are manufacturer.

With more than 35 years history, Wiskind has vast experiences in design, production, transportation and installation of steel building systems. We have been committed to providing customers with the most reasonable and economical solution, so that the customers can achieve steel building dream. Based on 35 years of development, we have a professional management team in steel structure design, production and installation, meanwhile, we continue to develop new technologies, new panels, and access to a number of national patents. The production management has obtained ISO9001 certification, roofing system products obtained FM certification.

In the past 35 years, Wiskind exports more than 50 countries and regions. We access to the praises of many customers for our high-quality steel construction products and professional services.
Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

Your trustworthy and reliable partner

Competitive Price

With over 35 years of experience in steel structure industry, Wiskind can provide the most reasonable and economical scheme to prevent over designs.

Long term partnerships with raw material product suppliers give us the ability to control quality and price effectively.

Large-scale production reduces our procurement, production and management costs, which can bring customers more economic benefits.

We produce both steel structure (frame) and wall and roof panels, reducing external sourcing, ensuring consistency in product quality and further saving on costs.

Vast Experience in the foreign projects

In the past 35 years, Wiskind's products are exported to more than 50 countries and regions, we have vast experience in design, transportation and overseas installation. Do not worry that you are far away from us, whether Asia, Oceania, America or Africa, we can provide installation workers or installation instructions according to customer needs for the project. For us, the end of a project is not you pay us to get the products, but you successfully complete the installation of our products.

Good Quality

Quality first, which is the key to our success in these years. We develop new technologies to improve the performance of our products, even if using the same raw materials, our products will be in more high quality.

Reputation

Our company have a good reputation and credibility in the industry. The customers that we have cooperated evaluate our company as follow, "This is a professional company, which has good service attitude, which really solves problem for customers, which can be trusted by the customers.It's a great thing to cooperate with such a company. You don't need to worry about the quality of the products, don't need to worry about the transport and installation.They will give you the most reasonable and economical design, transportation and installation plan"

Packing and Shipping                                                                                                      

Large-Span Peb Steel Structure for Warehouse / Workshop / Garage / Hangar

Packing Detail:
(1)Packing the main frame steel structure components together with secondary parts by channnel tray and belt.
(2)Packing the purlin into the bundles by the steel strip
(3)packing the small parts by bags and EPS foam
(4)packing sets parts by some box
(5)Loading all the packages into the container.

Delivery Time:
30 days after the deposit and confirm the drawing

Payment Terms of Wiskind:

Payment : L/C or by T/T (30% prepaid as depsit, the balance 70% before shipment)