Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line

China Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line, Find details about China Sparklinbottling Plants, Sparkling Water Line from Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line

Model NO.
DCGF24-24-8
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Suit Bottle Type
Glass Bottle with Metal Crown Cap, Plastic Bottle
Guarantee
One Year
Electricity
Mitsubishi Siemens Schneider
Delivery Time
40-50day
Suit Bottle Volume
250ml, 330ml, 500ml, 750ml, 1500ml, 1000ml
Suit Filling Liquid
Glass Bottle Beer, Wine, Soda, Carbonated Beverage
Contain Machine 1
Gas Beverage Mixing, Mixing Tank, Sugar Melt
Contain Machine 2
Filling, Labeling, Wrapping Machine, Date Printer
Capacity
2000bph 4000bph 6000bph 8000bph 11000bph 13000bph
After Sale Service
Engineer Go Local Install, Train Buyer Use
Trademark
tango
Transport Package
Wooden Case
Specification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12 50-50-15
Origin
Zhangjiagang
HS Code
8422301090
Model NO.
DCGF24-24-8
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Plastic
Suit Bottle Type
Glass Bottle with Metal Crown Cap, Plastic Bottle
Guarantee
One Year
Electricity
Mitsubishi Siemens Schneider
Delivery Time
40-50day
Suit Bottle Volume
250ml, 330ml, 500ml, 750ml, 1500ml, 1000ml
Suit Filling Liquid
Glass Bottle Beer, Wine, Soda, Carbonated Beverage
Contain Machine 1
Gas Beverage Mixing, Mixing Tank, Sugar Melt
Contain Machine 2
Filling, Labeling, Wrapping Machine, Date Printer
Capacity
2000bph 4000bph 6000bph 8000bph 11000bph 13000bph
After Sale Service
Engineer Go Local Install, Train Buyer Use
Trademark
tango
Transport Package
Wooden Case
Specification
8-8-3 16-12-6 24-24-8 32-32-10 40-40-12 50-50-15
Origin
Zhangjiagang
HS Code
8422301090
Product description:
  Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line
Automatic bottle sparking soda water beer filling packing production Line 

Summary:

For filling carbonated drink contains washing, filling and capping mWith complete automation, suitable for filling carbonated drink into polyester bottles And PET bottles. It can be used for all kinds of bottles. The bottleneck blocking makes The process of changing bottles easily by only adjusting the height of conveyor chain.
The filling process adopts the micro-pressure technology, Which makes filling process faster and more stable


Inner fracture:

Plastic bottle


Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line
Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line

Main features
 
Model (CGFB) 8-8-316-12-618-18-624-24-832-32-1040-40-1250-50-1260-60-15
Washing head812182432405060
Filling head812182432405060
Capping head3686810121215
Capacity (500ml)2000bph3000bph6000bph10000bph13000bph16000bph20000bph24000bph
Voltage 380V/50Hz ; 380V/60Hz, 380V/50Hz, 220V/60Hz
Overall size L*W*H2000*1500*2200mm2200*1600*2200mm2500*1750*2200mm2950*2150*2200mm3720*2800*2200mm4180*3200*2200mm4720*3350*2750mm6000*5450*2750mm

 
Auxiliary machines
Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line
Contact info:

Facebook:tangomachine ;  whatapap/phone:+8613739169728

Flow chart:
Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line

Some key affair that client interest as follow:

Term and condition:
1. Payment
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;

2. Delivery time 
60 days after received the down payment;

3. Training
Against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;

4. Installation and adjustment 
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's visa application cost, round air tickets, food & board before his departure; And pay USD 80/day to engineer.

5. Guarantee
one year

Competitive Advantages
Well and High Quality Control , 
Prompt Delivery ,long term testing before delivery
improve new technology all time
Customer's Design and Logo are Welcome , 
Competitive Prices , 
Earth-friendly Products , 
In a Variety of Design , 
Small Order Acceptable , 
ODM Accepted , 
OEM Accepted .


High quality: international brand electricity and good material
Our machines are using world famous brand component.
MITSUBISH PLC variable-frequency governor and OMRON optical switch form Japan.
SCHNEIDER electrical appliance components from France and Germany.
LG air switch,contactor and circuit breaker from South Korea.
SEMIKRON control thyristors from Germany.
BOURNS potentiometer from America.

Professional After Sale Service
Our engineer will be on site to guide installation and debugging , we also provide free staff training. Further more,Our After Sale service department offering 24 hours 7days service ,we will quickly respond you once you have any question when using our machines.

Long history of the Company
Our company is famous for its finest quality and enjoys a long-standing reputation at home and abroad. Having a long history of more than two decades,great experience accumulated in such a long time making us on the top list of Chinese company.


For more:
  
phone:+8613739169728
Facebook:tangomachine
 


Workshop photo:

Automatic Bottle Sparking Soda Water Beer Filling Packing Production Line