Steam Turbine Condenser Parallel Flow Turbine

China Steam Turbine Condenser Parallel Flow Turbine, Find details about China Steam Turbine, Steam Turbine Generator from Steam Turbine Condenser Parallel Flow Turbine

Model NO.
Steam Turbine
Trademark
SEMC
Specification
Standard Specification
Origin
Shanghai China
HS Code
8402119000
Model NO.
Steam Turbine
Trademark
SEMC
Specification
Standard Specification
Origin
Shanghai China
HS Code
8402119000
Product Details
Product NameSteam Turbine condenser parallel flow Turbine
Type of outputDC/AC Three Phase/AC Single Phase
Generator typeDC Generator/ Synchronous Generator
Power100KW-2000KW

A complete set of steam turbine island comprises of following equipments and sub-systems: 

1.Turbine-generator set  -
--power is generated through the action of generator driven by the turbine connected to it.
2.Water-condensation system
--
steam is condensed to water to be circulated to boiler and heated again.
3.Vacuum system 
    A.sub-system of main steam (
where steam circulates to propel the blades of turbine)
    B.water cycle system (
where water circulates from condenser to be heated again)
    C.DCS system (
monitors the operation of turbine and adjusts output rate)
    D. deaerating &water supplying system (
where oxygen is removed to ensure good operation environment and water is supplied)
4. Cooling Air system 
(for air-cooled unit only)
5. Generator system ( electricity is generated in this system)

Our protocol of delivering power plant construction project is as follow:
 
1.The Argumentation of Project
2. Engineering Design
    a. Turbo-Gen Set and its auxiliary systems
    b.Layout of Condensed Water System
    c.Layout of Heat System
    d.Civil Construction and Structure of Turbo-Gen Set
3.Equipment Purchase
    a.Turbo Generator Set and its auxiliary systems
    b.Condensed Water System
    c.Vacuum System
    d.Lower Temperature Heating System
4. Civil Construction
    a.Foundation and the upper structure of the Turbo Generator House
    b.Foundation of Turbo-Gen Set and its auxiliary systems
    c.Foundation of other structures
5. Operation & Maintenance
    a.Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for power plant personnel
    d.General Overhaul
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts

Reference List 
No.ItemProject detail
01CommissionerLafargeHolcimCentury Paper MillPolatSPGCL
02LocationGombe State, NigeriaLahore, PakistanTurkeyIndia
03Scope of serviceEPC projectEngineering, Purchase, Supervision of constructionEPC projectEPC project
04Applicationservice power plant
of a cement factory
service power station of a paper millindependent power plantindependent power plant
05Modelair-cooled condensing 
turbine island
condensing/extracting turbinecondensing turbinereheat turbine
06BrandSimonsHTPHTPHTC
07Standard of engineeringDIN.GBGBGB
08Layoutsingle-story layout with horizontal steam dischargedownward steam dischargedownward steam dischargedownward steam discharge
09Technical parameterspresure of steam inlet:8.5MP
tem. of steam inlet: 435C.
rated power:16.5MW
back pressure:15KPa
presure of steam inlet:4.9MP
tem. of steam inlet: 475C.
rated power:18MW
pressure of extraction:1.1MP
flow of extracted steam:54.6Mpa
back pressure:15KPa
presure of steam inlet:8.83MP
tem. of steam inlet: 435C.
rated power:51MW
back pressure:4.9KPa
presure of steam inlet:16.7MP
tem. of steam inlet: 538C.
rated power:300MW
pressure of extraction:1.1MP
back pressure:10KPa
10Performance (under standard condition)heat rate:2467kcal/kw
steam rate:4.16kg/kw
heat rate:2206.5kcal/kwheat rate:2215.3kcal/kw
steam rate:4.16kg/kw
steam rate:3.64kg/kw

Steam Turbine Condenser Parallel Flow Turbine
Steam Turbine Condenser Parallel Flow Turbine
Steam Turbine Condenser Parallel Flow Turbine