China 11kv Mv Load Bank for Gas Turbine Commissioning, Find details about China Load Bank, Loadbanks from 11kv Mv Load Bank for Gas Turbine Commissioning
Introduction
(1) According to the special requirements of users on site, in the agreement the technical standards of AC11KV-4000kW High Voltage Load Bank (hereinafter referred to as "system") and its accessories are proposed including their function, performance, usage, structure, installation and test to provide users with a high efficient and reliable choice, in order to meet the need for generator load test.
(2) The system consists of 1 sets of 3000kw load bank. The system is made up of two parts of measurement & control and load, mainly including the high voltage dry type AC load bank, automatic data acquisition system, automatically loading and unloading control system, the cooling device, auxiliary control, remote control box and PC software and so on.
(3)This system, which is of independent research and development of electricity load test equipment by our technology, combining high voltage dry type load module with the automatic measurement and control module, with excellent insulation protection performance, itcan directly detect high voltage generator output power and load capacity (no need a step down transformer), full load and overload test.
The system can be used with a computer to realize the intelligent control, automatically completing the special test to all electrical parameters of generating set and generating tables, graphs, and supporting the print, release from the cumbersome manual operation to provide scientific and efficient detection means for the large power high voltage generating sets.
(4) All the schematic diagrams of this agreement are for reference only please in kind prevail.