China Interlocking Paver Block Permeable Brick Paver Making Machine, Find details about China Interlocking Paver Block Machine, Permeable Brick Making Machine from Interlocking Paver Block Permeable Brick Paver Making Machine
Pallet size | mm | 1100-1200×950×28 |
Cycle time | S | 15-23 |
Rate Pressure | Mpa | 31.5 |
Vibration force | KN | 105 |
Power | KW | 48.9 |
Weight | T | 14.5 |
Vibration frequency | r/min | 3800-4500 |
Dimension | mm | 11500×4050×2800 |
Raw Materials | Crushed stone, sand, cement, fly ash, cinder, slag, gravel, and other industrial wastes. | |
Applied Products | Hollow blocks, solid block,soild brick, paving stones with or without face mix, garden and landscaping products, slabs, curbstones, grass paver, slope blocks, interlocking paver, etc. |
Production Capacity
Capacity for HWG-1000 block making machine
Brief Introduction
HWG-1000 block making machine,using servo motor vibration, it is more energy saving and the response speed is faster. With imported vane pump and hydraulic valve make the equipment run stably and the forming speed faster, which can greatly reduce the cost of brick making.The special vibration and feeding system of this machine can meet the demand of different blocks production for customers,like Hollow block, Solid block,grass-planting paver, curb stones, slope-protect bricks, inter-lock blocks and so on.
Advantage of using Servo motor vibration:
Through the use of Servo motors, smooth out the machine cycle resulting in the production of higher quality concrete products. Equally important, it extends the life of machine and mold parts.
It precisely control the acceleration and deceleration of the bull gear maximizes the life of machine parts by reducing the force to the machine components.
Application of HWG-1000 permeable paver making machine making permaable paver at site
Application:
Raw material
Block and Brick Sample
Hawen block making machines are for the manufacture of concrete bricks, blocks and paving. The machines are manufactured to heavy-duty standards to ensure long life, high performance and the manufacture of quality products.
Company Profile:
1. Manufacturer of Block making machine with more than 15 years experience
2. ISO Certified Company
Factory workshop
1. How many square meters required to set up a block factory?
Answer: Generally,the whole factory requires 2000-3000 square meters, including the recommended workshop to cover the equipments at 300-400 square meters,equipments are suggested to keep under the shed.
2. What kind of material can be used to produce concrete block?
Answer:Crushed stone(Max.10mm),sand and Cement as raw material, coal fly ash, cinder, slag,gangue, gravel, and other industrial wastes.And if customer makes the top colored paving stone,then the face material of fine sand and white cement and pigmen are required.
3. Can I get the warranty for the machine?
Answer:The warranty for the machine is one year after installation or 15 months after shipment,whichever comes first.Spare parts will be sent to customers for free of charge during the warranty period. Warranty does not cover the wearing parts, in cases of incorrect handling, improper user, insufficient maintenance, unauthorized service or modifications to the machine, normal wear .
4.What is the delivery time?
Answer:The delivery time is 30-40 days upon receiving the down payment and mould drawing approval from customer.
5. What about your payment terms?
Answer:T/T and L/C are acceptable.
Generally,it requested to pay 30% as depoist by T/T before production, and the balance to be paid by T/T or Irrevocable,Confirmed LC at sight before shipment.
6. How to prepare the foundation for the equipments?
Answer:The foundation drawing for the whole plant will be provided within 07 days after the order confirmed,customer could prepare the foundation construction according to the drawing provided.
7.How about the installation & commissioning ?
Answer: After the equipments arrive customer's site,and the preparation for the foundation,water & electricity are ready,we will send 1 of our technician for the installation & commissioning,the technician will train customer's staff for the operation and maintenance of equipment.
8. How about the installation cost?
Answer:We will send our technician for the installation,customer should responsiblefor all the expense and the allowance of our technician.
9. Are the machine be tested in your factory before shipment?
Answer:Yes all of our machines will be tested in our workshop before container loading.You are warmly welcome to do the inspection before shipment.
10.Can I visit your factory before placing the order and where is your factory ?You are Answer: Warmly welcome to visit our factory any time.Our factory located in Quanzhou City,Fujian Province.
The nearest airport to our factory is Jinjiang airport,which is 30 minutes to our factory by car.
How to come to your city?
You could take the international flight to Guangzhou airport first,then take the domestic flight from Guangzhou airport to Jinjiang airport,we will pick you up from Jinjiang Airport.
Or take the high speed train From Guangzhou South to Quanzhou train station.