China Sywfs Smokeless Waste Burning Machine Cheap Hospital Medical Waste Incinerator, Find details about China Medical Waste Incinerator, Waste Incinerator Price from Sywfs Smokeless Waste Burning Machine Cheap Hospital Medical Waste Incinerator
(1) Gasified pyrolysis incineration is used for burning many kinds of waste.
(2) Waste can be burned once everyday by gasified incineration.
(3) Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust, dioxin etc.
(4) Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution.
(5) Compact structure and small land occupation.
Specification of hospital medical waste incinerator:
NO. | Item | Specification |
1 | Burning capacity | 20~30kg/time (3-6 times/day) |
2 | Incinerator size | 1.45m*0.9m*1.75m |
3 | Volume of incinerator | 1st combustion chamber 0.3m³; |
4 | Size of waste inlet hole | 480mm*600mm |
5 | Chimney | Outer diameter 280mm |
6 | Air blower | 0.37kw |
7 | Combustion burner | 0.11kw, fuel consumption 4-6kg/h |
8 | Re-combustion burner | 0.11kw, fuel consumption 4-6kg/h |
9 | Running-voltage | 220V /380V/customized |
10 | Weight | About 2300kg |
Main products:
FAQ:
Q: How to purchase your products ?
A: You can contact with us and purchase from our company directly. Normal procedure is: offer, sign contract, payment and shipment.
Q: What's the warranty for the products ?
A: The free warranty is one year from the date of commissioning qualified. However, we will still provide good after-sales service after warranty period.
Q: Can we visit your factory ?
A: Of course, welcome to visit our factory if you come to China.
Q: How long is the validity of quotation ?
A: Generally, our price is valid within one month from the date of quotation. The
price will be adjusted appropriately as the price fluctuation of raw material in
the market.
Q: What's the production date after we confirm the order ?
A: This depends on the quantity. Normally, for the mass production, we need about
7-10 days to finish the production.