Product Description Product features
a,Large 4.2mm flow hole, sludge like sewage is easy to discharge and not easy to block.
b,New flow regulator, drainage interval can be adjusted at will.
C,Canceling the manual drain valve at the bottom makes the disassembly and maintenance of the new process easier and more convenient.
d,Penetrating fluid: various compressed gases.
e,Applicable pressure ≤ 2.0MPa, temperature 2-80 ºC, alloy heavy valve plate steel, durable and superior.
f,Inlet nozzle: 1 / 2 "NPT outlet nozzle: 8 Ф gas pipe detachable.
g,
Convenient installation, no wiring, high reliability, high safety; no fear of organic solvent, strong self-cleaning function, two filter nets, the valve port is not easy to block, to ensure smooth drainage; the valve body adopts screw type disassembly, which is very convenient for maintenance at ordinary times.Details Images
Instructions:1.ring installation, confirm the direction of inlet and outlet according to the arrow, and keep the drain body in the vertical direction (the valve body is installed correctly).
2.If the water volume is especially large, turn the regulating valve anticlockwise to loosen the regulating water volume, and tighten the nut after adjusting.
3.If there is no drainage, turn the regulating valve anticlockwise to let the air pressure wash away the dirt and then tighten the regulating valve.
4.If the environment is too dirty, clean the filter screen regularly. Step 1) first close the air inlet valve and confirm that there is no pressure inside. 2) loosen the upper cover, take out the upper cover filter screen and clean it. When the upper cover is replaced, pin it tightly. 3) loosen the lower cover, take out the lower cover filter screen and clean it, and then install it in turn.