100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart

China 100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart, Find details about China Mineral Machinery, Mining Machine from 100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart

Model NO.
WKD-Gold PL
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
OEM
Yes
Trademark
JXWKD
Transport Package
No Package
Specification
depends on model
Origin
China
HS Code
8474100000
Model NO.
WKD-Gold PL
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
OEM
Yes
Trademark
JXWKD
Transport Package
No Package
Specification
depends on model
Origin
China
HS Code
8474100000
100 TPH Placer/Alluvial Gold Mining Equipment Processing Flowchart
100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart
Factory Direct Sale Placer Alluvial Gold Processing Mining Washing Plant

Alluvial/Placer Gold Mining Plant:

1. Washing and Screening System

The excavator feeds raw materials into the mobile trommel screen which have hopper and primary screen. The primary screen is to screen the larger sized gravel to avoid clogging the hopper. At the same time rinse the material with water. Then the materials will into trommel screen which has 2 screen mesh(6mm and 15mm) for second screening. And it will be divided into three types, less than 6mm, 6-15mm and more than 15mm. (6mm and 15mm screen mesh just for reference, we can do what you want)



2. -6mm Alluvial Gold Concentrating System

The alluvial gold below 6mm enters the centrifugal concentrator to produce the concentrates and tailings. Concentrates enters the shaking table to produce the final concentrates. Tailings enters the sluice box for recycling again. One centrifugal concentrator works and the other one removes the collected fine gold. Same as sluice box. The time for manual cleaning on centrifugal concentrator will be 2-6 hours later. The time for manual cleaning on sluice box will be 4-6 hours later.


3. 6-15mm AlluvialGold Concentrating System

The alluvial gold between 6mm and 15mm enters the vibrating sluice box to produce the concentrates and tailings. The time for manual cleaning on vibrating sluice box will be 4-6 hours later. Same as carpet sluice box.


4. +15mm Alluvial Gold ConcentratingSystem

The probability of gold in the +15 mm material is low, so manual picking is recommended.


5. Final Concentrates Processing System

The collected concentrates from contrifugal concentrator, vibrating sluice box and carpet sluice box will into shaking table and then get the final concentrates.
 
we can help provide separation processing flowchart for different minerals 
tin oresilica sandtungsten 
coltan oregold silica sandtitanium
tantalum orezircon sandcoal
cassiterite oregold sandsand ore
tantalite oreplacer goldchromium ore
Diamond orealluvial goldMonazite Sand
copper oreclay goldtungsten ore
barite oreriver goldllmenite
chrome oreriver sandwolfram ore
iron oreRiver sand goldniobium
manganese oresand gravelrutile
barite oretopsoilHematite

Detailed Images:

Factory Direct Sale Placer Alluvial Gold Processing Mining Washing Plant
100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart
Factory Direct Sale Placer Alluvial Gold Processing Mining Washing Plant
Factory Direct Sale Placer Alluvial Gold Processing Mining Washing Plant
Factory Direct Sale Placer Alluvial Gold Processing Mining Washing Plant

Company Information


Victor is a large mineral processing manufacturer for 15 years history, with covering an area of 48,000 square meters and 20,000 square meters for workshop, with various large modernized machinery facilities, professional R&D team and installation team.
With 32% market share in China and the rest to overseas, already successfully exported to over 50 countries, such as USA, England, Australia, Brazil, Turkey, Italy, Russia, South Africa, Zimbabwe, Sudan, Ghana, Congo, Morocco, India,Indonesia, Malaysia, Philippines, North Korea, Mongolia, Vietnam, Thailand etc.

Our goal is to provide one-stop service for you and assist you to solve all problems from investment to his return in the field of mining, including the preliminary mineral analysis, mineral processing test, engineering design, equipment debugging and technical training etc.. 
We are expert especially at mining separating and lab mining plant, main products as below:
Gold trommel wash plant
Shaking table
Spiral chute separator
Centrifugal gold concentrator
Jig separator machines
Waste recycling machine
Grinding and mill crusher
Flotation cell machine
Magnetic separator
Laboratory mining plant
100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart100 Tph Placer/Alluvial Gold Mining Equipment Processing Flowchart

Contact Us

Matthews Lai

Jiangxi Victor International Mining Equipment Co.,Ltd

(eight six one three three six one seven seven nine zero one two)