Plastic Bottle Portable Water Bottling Plant in High Quality

China Plastic Bottle Portable Water Bottling Plant in High Quality, Find details about China Water Bottling Plant, Prefabricated Bottling Machine from Plastic Bottle Portable Water Bottling Plant in High Quality

Model NO.
CGF 24-24-8
Capacity
6000~8000bph
Bottle Type
Pet/Glass
Bottle Size
250~2000ml
Bottle Diameter
50~110mm
Bottle Height
160~320mm
Certificate
Ce,ISO9001-2015
Control
PLC(Simens/Mistsubishi)
Motor
Simens
Electrical Parts
Schneider/Mitsubishi
Trademark
Sky Machine
Transport Package
Wooden Case
Specification
3550mmx2650mmx2700mm
Origin
Jiangsu Province
HS Code
8422301090
Model NO.
CGF 24-24-8
Capacity
6000~8000bph
Bottle Type
Pet/Glass
Bottle Size
250~2000ml
Bottle Diameter
50~110mm
Bottle Height
160~320mm
Certificate
Ce,ISO9001-2015
Control
PLC(Simens/Mistsubishi)
Motor
Simens
Electrical Parts
Schneider/Mitsubishi
Trademark
Sky Machine
Transport Package
Wooden Case
Specification
3550mmx2650mmx2700mm
Origin
Jiangsu Province
HS Code
8422301090
Plastic Bottle Portable Water Bottling Plant in High Quality 
 
Products Introduction of Water bottling machine/Drinking filling machine/PET bottle filling line:
Products Introduction of This Automatic Monobloc Mineral Water Bottling Plant/Production Line adopts bottle neck holding transmission technology to realize fully automatic rinsing,filling and capping.Most elements of the electrical system employ famous brand advanced products.Each machine element that contacts with the liquid is made of high quality stainless steel.They obtain the advantages of good abrasive resistance,high stability,low failure rate,etc The quality of the equipment reaches the international advanced level



Flow Chart of Water Filling Production Line

Plastic Bottle Portable Water Bottling Plant in High Quality



Main components:
1) driving system;
2) bottle-loading system;
3) bottle-rinsing system;
4) handing-over system between rinsing and filling;
5) filling system;
6) handing-over system between filling and capping;
7) capping system;
8) cap-unscrambling system;
9) bottle-unloading system;
10) frame;
11) electrical system.


Main features

1,Rinser
Plastic Bottle Portable Water Bottling Plant in High Quality
 
  1. The rotary wheel is a fully stainless steel welded structure.
  2. The machine applies unique overturning bottle clamp, which is an innovation of our company. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
  3. The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
  4. All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
  5. The rinser is driven by driving system positioned inside machine frame via gear transmission.
  6. Transfer starwheel
  7. Made of stainless steel of superior quality.
  8. Equipped with bottle jam protection device. 
2,Filler

Plastic Bottle Portable Water Bottling Plant in High Quality
 
  1. Rotary wheel fully made of stainless steel SUS 304.
  2. Gravity filling method.
  3. Filling valves are made of SUS316L.
  4. Filling valves are reasonably structured with accurate filling.
  5. Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
  6. Level of cylinder is controlled with float-ball.
  7. Filler is driven through gears inside the machine frame.
  8. Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.

3,Capper
Plastic Bottle Portable Water Bottling Plant in High Quality

Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock. Our capper features as follows:
The equipment is designed and used the technology of  Arol from Italy, most advance technology in the world, developed with the experience of asepsis filling machine. For example, I) extruding wheel (main part to control the stability when sealing), uses the technology of Arol. Kinematical and kinetic design of the wheel by experts improves the stability and credibility of the equipment. II) Sealing faucet (main part to control the credibility of sealing), is improved by experts with the design of alnico. Besides the magnetic contortion variation device, there is variation dial which makes variation more easily. The benefit of this design is not only it can set the contortion, but also it makes contortion more precise and credible, and reduces inferior.
Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
The capper is equipped with inlet bottle detection switch.
Centrifugal way of cap arranging is adopted to reduce damage of caps.
A cap inspecting system is applied to control on-off of elevator.

Machine List of Water Bottling Machine/Production Line
ModelWashing headsFilling headsCapping headsCapacity(b/h)500mlMotor power(kw)Overall dimension(mm)
CGF14-12-5141253000-50001.52100*1400*2500
CGF16-16-5161656000-80002.22460*1720*2650
CGF24-24-8242488000-1200033100*2100*2650
CGF32-32-1032321012000-1500043500*2500*2650
CGF40-40-1240401216000-200007.54600*1800*2650
CGF50-50-1550501524000-26000115800*4500*3400
CGF60-60-1560601526000-30000126500*4500*3400
CGF72-72-1872721830000-36000146800*4500*3700

Company Introduction:
Plastic Bottle Portable Water Bottling Plant in High Quality

Company Certificate
Plastic Bottle Portable Water Bottling Plant in High Quality

FAQ:

Q1:What's your guarantee or the warranty of the quality if we buy your machines?
A1:We offer you high quality machines with 1 year guarantee . we will give u spare part free in 1 year,
      Life long after service. Mean while, our engineers go more than 50 countries for debugging, with rich                    experience.
 
Q2:When can I get my machine after I paid?
A3:We will deliver the machines on time as the date we agreed both side.
 
Q3:How can I install my machine when it arrives?
A3:We will send our engineer to your side as soon as you get all your machines ready , for testing
and teaching your technicians how to run the machines. 
 
Q4:What's the delivery time?
A4:30-45 days after the T/T deposit or L/C.
 
Q5:What's min order quantity?
A5:1 unit