Fireproof Paint for Steel Structure Workshop

China Fireproof Paint for Steel Structure Workshop, Find details about China Thick Fire Retardant Coating, Steel Structure Coating from Fireproof Paint for Steel Structure Workshop

Model NO.
JX-111
Method
Spray
Level
Primer
Certification
ISO14001, ISO9001
Substrate
Steel
Components
Powder
Formation Mechanism
Non Conversion Type
Fire Resistant Time
3hours
Trademark
Youlinsheng
Transport Package
Bag
Specification
50KG/bag
Origin
China
HS Code
381600000
Model NO.
JX-111
Method
Spray
Level
Primer
Certification
ISO14001, ISO9001
Substrate
Steel
Components
Powder
Formation Mechanism
Non Conversion Type
Fire Resistant Time
3hours
Trademark
Youlinsheng
Transport Package
Bag
Specification
50KG/bag
Origin
China
HS Code
381600000
Fireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure WorkshopFireproof Paint for Steel Structure Workshop
 
Fireproof Paint for Steel Structure Workshop
 

Specification:
1, thick steel structure fire retardant coating does not contain asbestos and organic solvents, no harm to the human body.
2, thick steel structure fire retardant coating direct spraying and coating construction, drying and curing fast.
3, the coating light, strong bond, high strength, anti-corrosion performance is superior.
4, excellent fire resistance, weather resistance, outdoor use must do fire coating.
5. If necessary, the substrate shall not be treated with anti-corrosion treatment.
Instruction:
1. Before the coating of fire retardant coating, the surface derusting and anti-rust primer coating of steel members shall comply with the design requirements and the current relevant national specifications, shall thoroughly remove the dust, oil and other sundry on the surface of steel members.
2. Fire retardant coating should be applied before interior decoration and under the condition that it will not be damaged by subsequent works. During construction, the walls, doors and Windows, mechanical equipment and other components that do not need fire protection should be shielded and protected.
3. Brush the interface agent of Dongan steel structure once before spraying, and apply the coating method after the surface of the interface agent dries. Before painting, mix and stir evenly according to the ratio of powder: emulsion = 1:1, so that there is no caking thick fluid state.
4. The thin consistency shall be determined according to the coating method, which is convenient for construction, not flowing, and firmly bonded. For extra wide large steel should be added steel mesh, in order to prevent paint leakage or separation.
5. When spraying, use concave and convex bucket spray gun with air pressure of 0.6 ~ 0.8mpa and nozzle diameter of 6 ~ 10mm. The spray gun is perpendicular to the surface of the coated member, 40 ~ 60mm is appropriate.
6. The first time of spraying construction is not too thick, and the next time after it is dry, it is better not to flow until it reaches the standard thickness. The coating method of fireproof coating is basically the same as that of cement coating. Reference dosage: 20-22 kg / m2/ 25 mm