Super Torus Ring

China Super Torus Ring, Find details about China Plastic Torus Ring, Super Torus Saddle from Super Torus Ring

Model NO.
FXP-DB210309-A1
Usage
Chemical Engineering, Chemical Industry Product, Sewage Treatment, Speed up Gas& Liquid Contacting and Particle Fall
Effect
Speed up Gas& Liquid Contacting and Particle Fall
Source
No Descriptioin
Trademark
FXSINO
Transport Package
Small Bag, Super Sack, Carton and So on
Specification
25, 50, 76 mm
Origin
China
HS Code
3926909090
Model NO.
FXP-DB210309-A1
Usage
Chemical Engineering, Chemical Industry Product, Sewage Treatment, Speed up Gas& Liquid Contacting and Particle Fall
Effect
Speed up Gas& Liquid Contacting and Particle Fall
Source
No Descriptioin
Trademark
FXSINO
Transport Package
Small Bag, Super Sack, Carton and So on
Specification
25, 50, 76 mm
Origin
China
HS Code
3926909090
Product Description

Super torus ring :
The most obvious change is arcuate concave and convex petals replaces curve or wavy profile.Groove under petals on the saddle's edge will speed up Gas& liquid contacting and particle fall down. Meanwhile, 6 pieces large size opening window on the center of ring avoids blocking phenomenon happening and reduce Pressure drop. Its performance is better than IMTP.

Size inchWeight Kg/m³Number/m³Surface area m²/m³Void ratio %
17036,60024090
2625,60011094
3411,2459096
Detailed Photos
Super Torus Ring
Groove under petals on the saddle's edge will speed up Gas& liquid contacting and particle fall down

 

Packaging & Shipping
Super Torus Ring
Super Torus Ring
Super Torus Ring


Packaging:
1: Round type Super sack(1000*1000*1000 mm) on Fumigation Pallet
20 super sacks is equal to one 20 GP container loading quantity
2: 100L Plastic Woven bag
10 bags is equal to one cubic meter
3: Cartons on Fumigation pallet
8 cartons is equal to one cubic meter
If you have any other requirement, do it on your requirement.

Shipping:
Once achieved Purchase with us, we will let you know our production Production plan and schedule.In case of delayed shipment, We will notify customers three days in advance.

 

Installation Instructions

Installation
1:According to the tower equipment diagram,and make sure that packing installation heights is correct.
2:When installing, it should always be poured from a certain height away from the packing layer. People should not stand directly on the packing to prevent the packing from deformation and uneven density. Wooden boards can be laid on the packing to disperse the force.
3:Other sundries, packaging bags, etc. is forbidden during the installation
4:Generally filled by random packing
5:After finished, if there is unevenness, use a wooden strip to naturally push it flat


 

Super Torus Ring
Super Torus Ring
Super Torus Ring


 

Company Profile

Founded in Pingxiang City of Jiangxi Province in 1998, mainly engaged in the design and manufacture of tower internals, packing, tower trays and the process of energy saving. Mainly develop the production, test and engineering service of mass transfer and separation in Chemical, Petrochemical, Refinery, Fertilizer, Oil & Gas and Environmental Protection areas.
With many years of technological development and production innovation, FXSINO has a very complete production equipment and strength. Widely cooperation with domestic famous Research institute & Multinational Group let FXSINO gain an unprecedented leap in the filed of production application recently.We provide our clients the best priced tower packing, trays and tower internals with good quality, practical utility and high - efficiency. Meanwhile, positively assist our customer resolve some questions which happened in project design, equipment commission, later maintenance& replacement etc.


 

Super Torus Ring
Super Torus Ring
Super Torus Ring


 

Our Advantages

FXSINO Advantage:
1:Automatic Intelligent warehouse
1.1 Allows auto handling and scanning of label info via OCR technology which integrated to Fxsino's warehouse system.
1.2 Magnetic Guidance Lurking AGV Unmanned vehicle can pick, deliver,yard all cargo to warehouse.
1.3: Connected with FXSINO EPR to fulfill warehouse process automation
1.4:Warehouse capacity is close to 80000 cbms

2:Intelligent management robot
2.1: 24 hours non-stop inspection against product's quality,package,worker's efficiency and so on .
2.2 Timely find equipment's failure and inform technical staff to repair
2.3.Face recognition technology will monitor workers working status and prevent irregularities by outsiders.

3:AR visual system+5G+MAS
3.1 Based on China Unicom mobile proxy server full coverage, Our customers can see the production status of orders in real time through AR glasses.
3.2 we can collect all data,include in product daily output, material consumption, warehouse real-time inventory, order progress and so on via 5G data platform.

4:Technical research and development capability
4.1 Through cooperation with co-partner named tianjin University,Zhejiang University of Technology,Nanchang University,Tsinghua University and so on,we can provide EPC to you. Meanwhile, to assist customers to resolve with facing problem.

 

Super Torus Ring
Super Torus Ring

 

After Sales Service

After sales service
1:Pre-purchase service
Fully understand customer's requirement, and give our professional opinion to help them.

2:User Training
Owing to our product has many different type, so it has many different installation way. For each type product, we must let you know its basically installation way. If necessary, issue one installation manual to them.

3:Warranty services
So called"Warranty services" is repairing replacement of selected parts for a selected period of time. For the first year, the customers are provided with free replacement or repairing of the device for any problem except for Abnormal use environment. For EPC project, we will issue our warranty booklet to our customer for each components. As for unmentioned, we will negotiated with our customer about warranty range and period

4:Online support
24 hours online service. For different problems, we will find related staff to solve with your problem timely.

5:Return and Replacement
In the warranty period, we provide free replacement of the product in case of any queries. Of course, if customers does not agree, we will refund after reduce some fees related with this deal.

6:Outsourcing and guiding installation
For customer's different requirement, Under achieving related fees payed standard(such as worker daily install fees,board and lodging and so on),we can send our installation team to help customer to install product installation. Of course, if you do not need our installation, we also send our engineer to guide how to install. So you would pay for the guiding fees. 

FAQ

About US
1: Are you a manufacture or trader?
We are a professional manufacturer over 20 years
2: Do you participate in Exhibition?
Yes, Such Achema, Chemical Technology Equipment Expo, ECEE and so on
3:Where is your company? And visit?
Located in Anyuan Industry Park, Pingxiang City, Jiangxi Province.Welcome you to visit
4:Payment way
For oversea market, 30% advanced payment and 70% against copy of B/L or negotiation with you
5: After sales service
Please watch our related description
6:How long does it take to receive a reply after sending an inquiry?
24 hours. For busy, 48 hours.
7:Working time
A.M 8:00-P.M.5:00. However, for any question from internet, telephone,wechat and so on, answer you immediately.
8:Third-party test?
We have our owned testing center. If you need third-party testing, we will contact with them to do it.
9: QC
Pre-sales: Material test, adopt Olympus spectrometer,material test report, third party test(necessary)
In-sales: test product material, weight, size, bulk number,pressure,Temperature resistance
After-sales:
Providing professional installation guidance and on-site guidance if necessary
If any problem, offer suitable opinion to solve.

About product
1:customized and logo?
Yes, we can do it
2:Package
Small plastic woven bag, super sack, cartons or upon your requirement
3:Certification
If necessary, we will entrust third-party to do it
4: MOQ
1 cubic meter
5:Production time
5-7 days to meet one 20 FCL container loading requirement
6:How much is the proofing fee? How long does the sample come out?
If only need 3D proofing, 5-7 days will finish after confirming drawing. If only need injected sample, 30-40 days will finish after confirming mold
7:HS code
Common customs codes is 3926909090,8419909000,6903200000,8419909000 and so on.