110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower

China 110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower, Find details about China Steel Tower, 110kv Tower from 110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower

Model NO.
ZDAT-002
Structure
M Type
Trademark
Zhongda
Transport Package
Standard Export Package
Specification
according to buyer′s requirement
Origin
China
HS Code
73049000
Model NO.
ZDAT-002
Structure
M Type
Trademark
Zhongda
Transport Package
Standard Export Package
Specification
according to buyer′s requirement
Origin
China
HS Code
73049000

About Us:
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower

We are leading Chinese Tower manufacturer which have 7 years experiences, offering all kind of tower products and related accessories, do installation and maintenance, and have been exporting more than 35 countries over the world.

  Also we have lots of experiences for the tower design based on International standard and offering low cost-effective solution to our clients worldwide.


 
self supporting tower usually is 3leg of 4leg tower, and its material is steel pipe or angle steel. As for the connection, tubular tower is connected by flange, and angle steel tower is connected by nuts and bolts.
Features:
1.strong wind resistance.
Small coefficient of wind load,
2.Save land resource, convenient location.
3.Convenient transportation and installation.
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower


 Product Specification & Parameters
Height: From10M-100M or according to buyer's requirement
Suit forElectric power transmission and distribution or Moblie &cell pone singnal transmission
ShapeAccording buyer's need
MaterialNormally Q235B/A36,yeild strength≥235mpa,Q345B/A572,yeild strength ≥
345mpa
Tolerance of dimensionaccoring to client's requirement
Tolerance of dimensionslip joint,flanged connected
CertificationCE ISO 
Length of per sectionWithin 13m once forming
Welding standard We have passed flaw testing.Internal and external double welding makes the welding beautiful in shape 
Welding Standard : AWS ( American Welding Society ) D 1.1
Producing processRaw material test-cutting-bending-welding-dimension verify-flange welding-hole dilling-sample assemble-surface clean-galvanization-recalibration-packing
packagespacking with plastic paper or according to buyer's demand
Life periodMore than 30years,according to installing enviroment
 
ISO Certification
 
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower
 Packing & Delivery
 

Packing Details  : packed according to customer's requirement

Delivery Time : usually 30 days after deposit received
 

110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower
110kv 132kv Galvanized Angel Steel Frame Power Transmission Tower