China Design Construction Building Structural Steel Workhouse Shed, Find details about China Steel Shed, Steel Structure from Design Construction Building Structural Steel Workhouse Shed
Material List For Prefabricated House | |
Main Steel Frame | |
Steel column | Fabricated by Q235 or Q345 Steel, 80*80 or 100*100 or 120*120 or 150*150 Square Tube, alkyd paiting, two primary painting, two finish painting. |
Triangular Steel structure roof | Fabricated by Q235 or Q345 Steel, C80, C100, C120, C140 Section steel, alkyd paiting, two primary painting, two finish painting. |
Roof Purlin | Fabricated by Q235 Steel, C80, C100, C120, C140 Section steel, alkyd paiting, two primary painting, two finish painting. |
Ordinary bolt | 4.8S, Galvanized |
Roof and Wall | |
Roof Panel | A: Insulated Steel Sandwich Panel wall (1) Panel width: 950mm; (2) Thickness: 50-1200mm. (3) Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane (1) Density of Rockwool: 120Kg/m3 (2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3 (3) Density of Polyurethane: 40Kg/m3 (4) Density of Fiber Glass:40Kg/m3, 60Kg/m3 |
Wall Panel | A: Insulated Steel Sandwich Panel wall (1) Panel width: 950mm; (2) Thickness: 50-1200mm. (3) Powder coated Color steel on both sides: 0.4mm/0.5mm/0.6mm B: Insulation: Polystyrene, Rockwool, Fiber Glass or Polyurethane (1) Density of Rockwool: 120Kg/m3 (2) Density of Polystyrene: 12Kg/m3, 16KG/M3 20KG/M3 (3) Density of Polyurethane: 40Kg/m3 (4) Density of Fiber Glass:40Kg/m3, 60Kg/m3 |
Edge Cover | 0.4mm galvanized color steel , angle Alu. |
Fasteners & Accessoreis | Nails\glue ect |
Ceiling&Flooring | |
Ceiling | 6mm gypsum board,with steel keel |
Plywood | 18mm film faced plywood |
Floor feather | 1.5mm PVC floor leather |
Door and window | |
Door | (1) External door: Single open door. Insulated with opening dimension 950*2100mm, furnished with lock with 3keys. (2) Inner door: Single open door. Insulated steel door. |
Window | 4mm glass PVC window witn flying screem |
Electrical System | |
Electric Cable | (1) Three diferent color. (2) Lighting: 2.5m m2. (3) Air condition: 4.0mm2 (4) BV cable, solid core |
PVC Wire Channel | PVC wire channel |
Lights | Double tube fluorescent lamp, 220V,50-60HZ |
Switches | Single Switch, with junction box |
Socket | 16A five hole univesal socket. |
Power Distribution Cabinet | Box+breakers+earth leakage protective device |
Water&Plumbing system(choose) | |
Water drain pipe | (1) PPR pipe, dim 16-20mm, connection fittings are made of copper, life span over 10 years. (2) Exhaust fan or air exchange hole, size 250mm*250mm made of steel or PVC |
Sanitary ware | (1) Western Close tool: ceramic, with pipes and installation fittings (2) Urinal: ceramic, with pipes and installation fittings (3) Wash basin: ceramic, with post, faucet, pipes and installation fittings (4) Shower head, Shower base, Water mixture |
Plumbing System and Rain Water Drainage System as per building design |
1. Professional Design and Engineering Team:
Full Solution for Site Camp Design. We could make design based on all your requirements.
2.Procurement and Manufacture for All Materials for Prefabricated Building:
We have a Professional Procurement team to make sure all materials are with good quality. And Our factory operation under ISO/CE/SGS standard, to make sure the fabrication works with high technology.
3.Site Management and Installtion Supervision:
We could send our engineer to help for the installation supervision, you just nee to prepare a team which know normal construction works will be OK.
1. How to buy your products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit is paid before producing and the balance before loading by TT.
2.How to control the quality of your product?
A: 1. Quality of the design: think about possible problems in advance and provide a high quality design solution.
2. Quality of the raw materials: choose the qualified raw materials.
3. Quality of the productions: precise manufacturing technique, experienced workers, strict quality inspection.
3. How to deal with quality problems?
A: Warranty is 3 years. Within the warranty period, we will be responsible for all quality problems caused by productions.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as requirements but the fees will be paid by customers.
5.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
6.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by customers.