Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge

China Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge, Find details about China Steel Structure Arch Bridge, Steel Arch Bridge from Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge

Model NO.
WT-027
Trademark
WT
Origin
Shandong, China
HS Code
9406
Model NO.
WT-027
Trademark
WT
Origin
Shandong, China
HS Code
9406

Product Description

High Strength Steel Structure Arch Bridge With Modern DesignRiver
Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge
Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge





1.Introduction:
Steel structure building is widely used as large factory, warehouse, workshops, bridges, stadiums and other buildings. Light steel structure building is a new type of building structure system, which is formed by the main steel framework linking up H-section, Z-section, and U-section steel components, roof and walls using a variety of panels and other components such as windows and doors.
Like Belows:
Features
  1. Size: Web plate 6MM---100MM; Flange plate6-100MM; Or as customer'quest.
  2. Materials: G250,G350ASTM36, Q195, 235B, Q345B or as customer's request.
  3. Standard: ASTM, ANSI, GB, DIN, JIS, EN, ISO.
  4. Surface treatment: Hot dipped galvanized
  5. Welding: one continuous weld full length.
  6. Length: We can cut to any lengths as customer request.
Advantage
  1. Design according to customers' requirements.
  2. Manufacture under complete quality control system---ISO9001.
  3. Easy to assemble and dismantle.
  4. Eco-friendly material: Can be used for several times and can be recycled.
  5. Shorter construction period, longer using time.
  6.  High strength and stiffness, high weight bearing.
  7. We can supply the sample for free.
  8. Delivery within 60 days and packing Wrapped in bundles by steel strips or as required.
  9. simple construction, low cost and light weight.
Production Workflow 
Production Technology
  1. CNC Cutting
  2. Stamping and Punching
  3. Bending
  4. Assembly
  5. Welding
  6. Buffing
  7. Sand Blasting
  8. Painting
  9. Hot Dip Galvanizing
  10. Electroplating
Application    1.Steel structure construction
    2.Prefabricated building/ prefab house

    3.Industrial plants/ Civil buildings
    4.Carports
Installation    We can provide installation services.

Please provide the following steel structure building importance calculation factors for quotation :
1.  Exact size : length * width *height ;
2.  Wind speed (max speed);
3.  Snow load (kg/m2 in max situation);
4.  Earth quake grade (if have) ;
5.  Live load and dead load for roof and flooring(special for mutli-floors building);
6.  The requirements for window and door;
7.  Max height and weight for crane to lift;
8.  What are the materials for roof and wall ?


If you have any demands, please don't hesitate to contact me. Looking forward your quotation!

Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge