PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes

China PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes, Find details about China Track Link Shoes, Track Link Shoes Assy from PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes

Model NO.
PC50 PC60 PC100 PC120 PC200
Machine Type
Crawler Excavator Bulldozer
Product
Bulldozer Excavator Track Link Shoes
Related Product
Track Roller/Carrier Roller /Front Idler Assy
Related Products
Track Link and Shoes/Sprocket and Segment
Color
Yellow, Black or Customized
Service
OEM ODM
Test Report
Provided
Hardness
HRC45-50
Process
Casting/Forging
Deliver Time
7-20 Days After Contrast Established
Advantage
Good Mechanical Properties
Working Condition
Construction and Leveling of Dumping Sites
Finish
Smooth
Trademark
Gold Forging
Transport Package
According to Customer Requirements
Specification
Base on drawing
Origin
Xiamen, China
HS Code
8431499900
Model NO.
PC50 PC60 PC100 PC120 PC200
Machine Type
Crawler Excavator Bulldozer
Product
Bulldozer Excavator Track Link Shoes
Related Product
Track Roller/Carrier Roller /Front Idler Assy
Related Products
Track Link and Shoes/Sprocket and Segment
Color
Yellow, Black or Customized
Service
OEM ODM
Test Report
Provided
Hardness
HRC45-50
Process
Casting/Forging
Deliver Time
7-20 Days After Contrast Established
Advantage
Good Mechanical Properties
Working Condition
Construction and Leveling of Dumping Sites
Finish
Smooth
Trademark
Gold Forging
Transport Package
According to Customer Requirements
Specification
Base on drawing
Origin
Xiamen, China
HS Code
8431499900
 
Dozer Excavator Track Link And Shoes Assembly 
 

Product Description

Product:Track Link Shoes 
Material:25MnB
Production Process:Casting/Forging
Surface Hardness:HRC45-50
Color:Black, Yellow or Customized 
Compatible Machine: Excavator/Bulldozer 
Certification:ISO9001
Deliver time: 7-15 days after contrast established 
Offer customized Service :Yes

 

Detailed Photos


PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes
 

MaterialTrack Shoes Material25MnB
Surface HardnessHRC45-50
Yield Point≥1100Re-N/mm²
Elongation≥7%
Tensile Strength≥1200Re-N/mm²
Impact Test ≥20J


Tips of select Track Shoes 

The wide variety of working conditions makes choosing the right shoe become very important . A good rule is choose the narrowest shoe that provides adequate flotation. Shoes that are too wide will loosen, bend and crack more easily. They require more power to run. Shoes of the correct width give maximum performance and the lowest possible cost to the entire system.
 

Main Feature

  1. Through quench-tempering processes to ensure excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
  2. Advanced automatic machining center, ensure the accuracy of assembly dimensions. 
  3. Automatic welding robot makes sure goods have steady and good welding quality.
  4. We can also produce any requested parts according to your blue print or samples.



PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes


 

PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes




PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes
 

Company Profile


Establised in 2007, Gold Forging always insist on quality first, service first, continuously introduce new equipment, improve products quanlity and increase production capacity.
Among them, forged bucket teeth, as one of the main products of Golden Forging, can match most brands on the market, and the R&D department is also committed to developing new bucket teeth to adapt to different brands of excavators, such as Caterpillar, Komatsu, Volvo, and mini excavators, etc.

PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes
PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes
 

Packaging & Shipping

PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes

PC50 PC60 PC100 PC120 PC200 Excavator Undercarriage Track Link Shoes
 

FAQ


1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located in Quanzhou ,and our sales department is in City centre of Xiamen.

2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

3. How about the payment terms?
We usually accept T/T or L/C. other terms also could be negotiated.

4. What is your minimum order?
It depends on what you are buying. Normally, we don't have MOQ request.

5. What is your delivery time?
If don't stock in factory : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.

6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.

7. Can offer the sample ?
For forged bucket teeth we can offer free sample, but the clients need bear the freight.